www.ti.com
UCD90120/4 EVM GUI Setup
3.2
UCD90120/4 EVM GUI Operation
The EVM comes pre-loaded with a 12 rail default project that sequences the EVM rails on at power up. It
is a good idea to export the default project to a file on the PC prior to making changes.
3.2.1
Launch TI-Fusion-Digital-Power-Designer
Navigate to the location where the Fusion GUI is installed and (Start, All Programs, Texas Instruments
Fusion Digital Power Designer, Fusion Digital Power Designer) and start it. A window similar to the
following will appear.
7
SLVU347 – December 2009
Evaluation Module for UCD90120 and UCD90124
Submit Documentation Feedback
Copyright © 2009, Texas Instruments Incorporated