7.3 List of Test Points
Table 7-1. Test Point Functions
TEST POINTS
NAME
DESCRIPTION
TP1
VIN
Converter input supply voltage
TP2
VREG
LDO voltage
TP3
PGOOD
Power good output
TP4
PGND
Power ground
TP5
CHB
Input B for loop injection
TP6
SW
Switch Node
TP7
VOUT
VOUT te
TP8
CHA
Input A for loop injection
TP9
PGND
Power ground
TP10
RF
RF pin
TP11
TRIP
TRIP pin
TP12
EN
Enable pin
TP13
VDD
VDD pin
TP14
MODE
MODE pin
TP15
AGND
Analog ground
7.4 Equipment Shutdown
Follow these steps when shutting down the equipment.
1. Shut down load
2. Shut down VIN
Test Procedure
12
TPS548A20 SWIFT™ Step-Down Converter Evaluation Module User's Guide
SLUUBC0A – DECEMBER 2015 – REVISED AUGUST 2021
Copyright © 2021 Texas Instruments Incorporated