User’s Guide
Sept 2012
DS90UB926QSEVB User’s Guide
Sept
2012
DS90UB926QSEVB User’s Guide
1
LIST OF FIGURES ....................................................................................................................................... 1
LIST OF TABLES ......................................................................................................................................... 1
1.
INTRODUCTION ............................................................................................................................... 2
1.1.
CONTENTS OF DS90UB926QSEVB ............................................................................................... 2
1.2.
HIGHLIGHTS OF EVB ...................................................................................................................... 2
1.3.
OPERATION – QUICK SETUP......................................................................................................... 3
1.4.
TROUBLE SHOOTING THE EVB .................................................................................................... 3
2.
BOARD SETUP DETAILS ................................................................................................................ 4
2.1.
POWER CONNECTIONS ................................................................................................................. 4
2.2.
FPD-LINK III CONNECTION ............................................................................................................. 4
2.3.
FACTORY SET SWITCH SETTINGS AND JUMPERS DEFAULT CONFIGURATION .................. 4
2.4.
LVCMOS OUTPUT CONNECTOR DESCRIPTION ......................................................................... 5
3.
APPENDIX – I2C, INTEGRATED SPA DONGLE ............................................................................ 6
3.1.
I2C SPA DONGLE HOOKUP ........................................................................................................... 6
3.2.
IDX BOARD DEFAULT ADDRESS .................................................................................................. 6
3.3.
ALP SOFTWARE SETUP ................................................................................................................. 7
3.3.1.
SYSTEM REQUIREMENTS .............................................................................................................. 7
3.3.2.
CD CONTENTS ................................................................................................................................. 7
3.3.3.
INSTALLATION OF THE ALP SOFTWARE .................................................................................... 7
3.3.4.
INSTALLATION OF THE USB DRIVER ........................................................................................... 8
3.3.5.
STARTUP - SOFTWARE DESCRIPTION ........................................................................................ 8
3.3.6.
TROUBLE SHOOTING ALP SOFTWARE ..................................................................................... 14
4.
EYE MONITOR – CMLOP/N ........................................................................................................... 16
5.
APPENDIX – USE OF OPTIONAL ROSENBERGER HSD CONNECTOR (J1) ........................... 16
6.
APPENDIX – USE OF OPTIONAL MINI-B USB CONNECTOR (J2) ............................................ 17
7.
APPENDIX - BOARD LAYOUT ...................................................................................................... 17
8.
SCHEMATIC ................................................................................................................................... 24
9.
BILL OF MATERIALS ..................................................................................................................... 29
LIST OF FIGURES
Figure 1: DS90UB926Q EVB ........................................................................................................................ 2
Figure 2: Factory Switch (S1,S2,S3,S4,S5) and Jumper (JP2) Configuration ............................................. 5
Figure 3: Initial ALP Screen .......................................................................................................................... 9
Figure 4: TOP View ..................................................................................................................................... 18
Figure 5: Bottom View ................................................................................................................................. 19
Figure 6: TOP Layer ................................................................................................................................... 20
Figure 7: GND Layer ................................................................................................................................... 21
Figure 8: PWR Layer .................................................................................................................................. 22
Figure 9: BOTTOM Layer ........................................................................................................................... 23
LIST OF TABLES
Table 1: Bill of Materials .............................................................................................................................. 29
Содержание DS90UB926QSEVB
Страница 18: ...www ti com 18 DS90UB926QSEVB User s Guide Sept 2012 Figure 4 TOP View...
Страница 19: ...www ti com Sept 2012 Literature Number SNLU114 19 Figure 5 Bottom View...
Страница 20: ...www ti com 20 DS90UB926QSEVB User s Guide Sept 2012 Figure 6 TOP Layer...
Страница 21: ...www ti com Sept 2012 Literature Number SNLU114 21 Figure 7 GND Layer...
Страница 22: ...www ti com 22 DS90UB926QSEVB User s Guide Sept 2012 Figure 8 PWR Layer...
Страница 23: ...www ti com Sept 2012 Literature Number SNLU114 23 Figure 9 BOTTOM Layer...
Страница 24: ...www ti com 24 DS90UB926QSEVB User s Guide Sept 2012 8 Schematic...
Страница 25: ...www ti com Sept 2012 Literature Number SNLU114 25...
Страница 26: ...www ti com 26 DS90UB926QSEVB User s Guide Sept 2012...
Страница 27: ...www ti com Sept 2012 Literature Number SNLU114 27...
Страница 28: ...www ti com 28 DS90UB926QSEVB User s Guide Sept 2012...
Страница 29: ...Schematic Sept 2012 Literature Number SNLU114 29 9 Bill of Materials Table 1 Bill of Materials...