DC Power Supply
+ -
Install cell
simulator shunts
Position shunts
to uC_SCL and
uC_SDA
Figure 2-1. EVM Connection for Basic Operation
BQ76952 EVM Quick Start Guide
www.ti.com
6
BQ76952 Evaluation Module
SLUUC33A – NOVEMBER 2019 – REVISED OCTOBER 2020
Submit Document Feedback
Copyright © 2020 Texas Instruments Incorporated