
Test Results
Figure 4. Load Dump, 500 mA to 0 mA
6.3
Start-Up
These procedures demonstrates start-up:
•
Set up the test bench as described in
•
Power TX with 19 V
•
Trigger scope sweep on TP2 AC IN
11
SLUUAE3A – August 2013 – Revised December 2013
bq51010BEVM-764 Evaluation Module (WCSP Package)
Copyright © 2013, Texas Instruments Incorporated