-
PS
+
Function
Generator
1 k
:
Power
Amplifier
Test and Measurement Summary
3.1.3
Switching Between Primary and Secondary Batteries
The test setup is shown in
. The specific equipment used for the test results in
is listed
below:
1. VIN_DC, VBAT_SEC and VBAT_PRI are configured as shown in
.
2. The function generator and power amplifier simulated VSTOR charging up and discharging.
3. VBAT_SEC, VBAT_PRI, VBAT_OK and VOR were measured with oscilloscope voltage probes at TP5,
TP6, J13 and J14, respectively.
Figure 7. Test Setup
11
SLUUAA8 – September 2013
User's Guide for bq25505 Battery Charger Evaluation Module for Energy
Harvesting
Copyright © 2013, Texas Instruments Incorporated