
DIN806BG
7-2
Tetra Pak
Hoyer
7.1 Cleaning and washing
The procedure for washing the pick-up machine
is as follows:
a- Prewashing with hot water (50°C).
b- Washing with detergent. Use a foam-
producing alkaline detergent or a gel with
good oil-emulsifying properties. Use in
concentrations from 2% to 10%, according to
the quantity of dirt present and the hardness
of the water used.
c- Rinse with water. Wait 10 minutes and then
rinse thoroughly to remove the emulsified dirt.
d- Removal of deposits. Use an acidic deposit
remover with low viscosity containing a blend
of wedding agents and emulsifiers. Use in
concentrations from 2% to 3%. The
recommended minimum contact time is 15 –
20 minutes.
e- Rinse with water.
f- Washing with disinfectant. Use a suitable
disinfectant diluted in water. Use in
concentrations from 1% to 1.2%. The
recommended minimum contact time is 15 –
20 minutes.
g- Rinse with water.
I
Warning:
Do not use high-pressure water jets.
7.2 Routine maintenance
7.2.1 Beginning of the season
•
Wash the pick-up machine and chocolate vat
thoroughly; refer to point 7.1 – CLEANING
AND WASHING;
•
Check the water level in the space surrounding
the tank;
•
Check the condition of the seals, and replace
them if necessary;
•
Lubricate seals;
material required:
7.1.1 Recommended products:
Detergent
Deposit remover
Disinfectant
SU928 (Diversey Lever)
P3-topax 52 (50/60°) (Henkel Ecolab)
P3-topax 99 (60°) (Henkel Ecolab)
SU616 (Diversey Lever)
P3-topax 17 (60°) (Henkel Ecolab)
Vaseline oil
•
Check that the emergency stop button is
functioning properly;
•
Conduct an overall inspection and tighten any
screws which may have come loose;
•
Check that there is no leakage at any of the
connections;
•
Check that all moving parts are working
efficiently, and replace them if necessary.
RETURN TO PM
Содержание Hoyer Dino C
Страница 41: ...DIN806BI 9 11 Tetra Pak Hoyer Fig 9 6 Opening of load grippers 4 1 1 2 2 3 3 RETURN TO PM LAY OUT LIST...
Страница 47: ...DIN806BI 9 17 Tetra Pak Hoyer Fig 9 9 Translation 2 2 2 2 3 4 2 2 2 2 3 4 3 5 3 1 RETURN TO PM LAY OUT LIST...
Страница 49: ...DIN806BI 9 19 Tetra Pak Hoyer Fig 9 10 Translation 4 3 2 1 5 11 9 10 9 8 7 6 RETURN TO PM LAY OUT LIST...
Страница 51: ...DIN806BI 9 21 Tetra Pak Hoyer Fig 9 11 Stick roller 3 2 3 2 3 2 3 2 1 3 2 2 RETURN TO PM LAY OUT LIST...
Страница 55: ...DIN806BI 9 25 Tetra Pak Hoyer Fig 9 13 Stick pick up 4 3 2 7 6 7 6 5 5 1 RETURN TO PM LAY OUT LIST...
Страница 57: ...DIN806BI 9 27 Tetra Pak Hoyer Fig 9 14 Candy bar pick up 15 RETURN TO PM LAY OUT LIST...
Страница 61: ...DIN806BI 9 31 Tetra Pak Hoyer Fig 9 16 Cone pick up 2 3 4 4 5 6 7 8 8 9 9 1 RETURN TO PM LAY OUT LIST...
Страница 65: ...DIN806BI 9 35 Tetra Pak Hoyer Fig 9 18 Wafer cup pick up 2 3 4 4 5 6 7 7 8 8 1 RETURN TO PM LAY OUT LIST...
Страница 67: ...DIN806BI 9 37 Tetra Pak Hoyer Fig 9 19 Bricket pick up 6 8 6 7 6 8 3 2 5 4 9 1 RETURN TO PM LAY OUT LIST...
Страница 71: ...DIN806BI 9 41 Tetra Pak Hoyer Fig 9 21 Juice coating device 3 2 1 9 20 9 22 9 23 9 24 RETURN TO PM LAY OUT LIST...
Страница 79: ...DIN806BI 9 49 Tetra Pak Hoyer Fig 9 25 Chocolate tank 2 4 1 3 4 6 8 9 10 5 7 11 11 11 RETURN TO PM LAY OUT LIST...