
DIN806BF
6-3
Tetra Pak
Hoyer
To turn on the machine, perform the following steps:
a. Turn on the power to the machine by turning the
main switch to the “ON” position.
b. About ½ hour before beginning production,
press F13 to warm up the coating vat.
c. Press F14 (Fig. 6.2) to keep the chocolate in
motion with the pump.
d. Press F1 (Fig. 6.2) to start up the chain, and
then press F3 (Fig. 6.2) MAN/AUTO.
Press F4 (Fig. 6.2) to start automatic production.
The machine will automatically begin the production
cycle.
Press F17 (Fig. 6.2) to start the pick-up movement.
If the manual production cycle is selected, activate
the individual stations by pressing the station enabling
buttons.
Fig. 6.2
6.2.1 Beginning production
F1
F2
F3
F4
F5
F12
F13
F14
F15
F16
F6
F17
F7
F18
F8
F19
F9
F20
F10
F21
F11
F22
A1
A2
6.2 Production cycle
RETURN TO PM
Содержание Hoyer Dino C
Страница 41: ...DIN806BI 9 11 Tetra Pak Hoyer Fig 9 6 Opening of load grippers 4 1 1 2 2 3 3 RETURN TO PM LAY OUT LIST...
Страница 47: ...DIN806BI 9 17 Tetra Pak Hoyer Fig 9 9 Translation 2 2 2 2 3 4 2 2 2 2 3 4 3 5 3 1 RETURN TO PM LAY OUT LIST...
Страница 49: ...DIN806BI 9 19 Tetra Pak Hoyer Fig 9 10 Translation 4 3 2 1 5 11 9 10 9 8 7 6 RETURN TO PM LAY OUT LIST...
Страница 51: ...DIN806BI 9 21 Tetra Pak Hoyer Fig 9 11 Stick roller 3 2 3 2 3 2 3 2 1 3 2 2 RETURN TO PM LAY OUT LIST...
Страница 55: ...DIN806BI 9 25 Tetra Pak Hoyer Fig 9 13 Stick pick up 4 3 2 7 6 7 6 5 5 1 RETURN TO PM LAY OUT LIST...
Страница 57: ...DIN806BI 9 27 Tetra Pak Hoyer Fig 9 14 Candy bar pick up 15 RETURN TO PM LAY OUT LIST...
Страница 61: ...DIN806BI 9 31 Tetra Pak Hoyer Fig 9 16 Cone pick up 2 3 4 4 5 6 7 8 8 9 9 1 RETURN TO PM LAY OUT LIST...
Страница 65: ...DIN806BI 9 35 Tetra Pak Hoyer Fig 9 18 Wafer cup pick up 2 3 4 4 5 6 7 7 8 8 1 RETURN TO PM LAY OUT LIST...
Страница 67: ...DIN806BI 9 37 Tetra Pak Hoyer Fig 9 19 Bricket pick up 6 8 6 7 6 8 3 2 5 4 9 1 RETURN TO PM LAY OUT LIST...
Страница 71: ...DIN806BI 9 41 Tetra Pak Hoyer Fig 9 21 Juice coating device 3 2 1 9 20 9 22 9 23 9 24 RETURN TO PM LAY OUT LIST...
Страница 79: ...DIN806BI 9 49 Tetra Pak Hoyer Fig 9 25 Chocolate tank 2 4 1 3 4 6 8 9 10 5 7 11 11 11 RETURN TO PM LAY OUT LIST...