8.2.2 Connections APU SMA SI
27
www.tesvolt.com
WARNING!
Installation and servicing may only be performed by qualified personnel. Only authorised TESVOLT GmbH personnel are permitted to open
the APU-Unit. Improper use or incorrect configuration may damage the APU-Unit.
Labeling
C
Description
DC connection for the positive pole of the Sunny Island
Charger -
DC connection for the negative pole of the Sunny Island
B
DC connection for the positive pole of the 1st battery module
Battery -
DC connection for the negative pole of the 1st battery module
Switch
On/off switch for the battery
E-Stop
Two-pin plug for the optional connection of an emergency off switch.
APU Fuse (F1)
Fuse element to protect the APU
CAN SMA
CAN port for communication between the battery and the Sunny Island.
Connection to the Sunny Island (master) ComSyncIn (single-cluster) or connection
to the Sunny Island (slave 2) ComSyncOut (multi-cluster)
LAN
When connecting to an existing network with DHCP, the battery
can be monitored using BatMon. The master/slave communication occurs
over the LAN connection.
Address
Rotary switch for adjusting the battery’s master/slave connections.
Further information can be found under point 11.1
BAT COM
Communication link to the battery module. Connect the BAT COM of the APU
to the BAT COM IN of the first battery module.
E.IA. .ENG-
TS
A.6
Содержание TS Series
Страница 1: ...Installation instructions TS series ...
Страница 2: ......
Страница 9: ...7 www tesvolt com 7 Technical data sheet E IA ENG TS A 6 OFF GRID OR ON GRID ...
Страница 12: ...Sunny Island connection 10 www tesvolt com E IA ENG TS A 6 ...
Страница 45: ......