Connection Slave 1 und Slave 2
+
_
+
_
25
www.tesvolt.com
Position
Description/Note
Description
A
Battery connection
Conductor cross-section: 50 mm² … 120 mm²
Cable diameter: 14 mm … 25 mm
Tightening torque: 12 Nm
cabel DC –
cabel DC +
C
D
AC power cable
Sunny Island: Connection AC2 Gen/Grid Terminals L, NTT and PE
Switching device: Connect Slave 1 to X3 Terminals L2, N and PE. Connect Slave 2
to X3 Terminals L3, N and PE. Conductor cross-section: 10 mm² … 16 mm²
B
Measuring cable for voltage
measurement
Sunny Island: Connection ExtVtg Terminals L and N
Switching device: Connect Slave 1 to X4 Terminals L2 and N. Connect Slave
2 to X4 Terminals L3 and N. Conductor cross-section: 1.5 mm² … 2.5 mm²
E
Data cable for internal
communication within the
Cluster
Sunny Island: ComSync In connection
For Slave 1: Internal communication bus connection from the Master
For Slave 2: Internal communication bus connection from Slave 1
F
Data cable for internal
communication within the
Cluster
Sunny Island: ComSync Out connection
For Slave 1: Internal communication bus connection to Slave 2
For Slave 2: Leave the termination resistor plugged in. Slave 2 is only
connected to Slave 1.
E.IA. .ENG-
TS
A.6
Содержание TS Series
Страница 1: ...Installation instructions TS series ...
Страница 2: ......
Страница 9: ...7 www tesvolt com 7 Technical data sheet E IA ENG TS A 6 OFF GRID OR ON GRID ...
Страница 12: ...Sunny Island connection 10 www tesvolt com E IA ENG TS A 6 ...
Страница 45: ......