24
www.tesvolt.com
G
Control cable for the
tie-breaker
Sunny Island: Connection Relay1 Terminals C and NC, switching device:
Connection X4 Terminals 1 and 2. The contactor of the coupling switch
engages when the multifunction relay engages.
Conductor cross-section: 1.5 mm² ... 2.5 mm²
H
Control cable for contactors
Q4 and Q6
Sunny Island: Connection Relay2 Terminals C and NO, switching device:
Connection X5 Terminals 1 and 2, Contactor Q4 engages when the
multifunction relay engages.
Conductor cross-section: 1.5 mm² ... 2.5 mm²
I
Measuring cable for
monitoring the tie-breaker
Sunny Island: Switching unit connections DigIn+ and Ba:
Connection X5 Terminals 3 and 4, Use a separate cable as the measuring
cable for monitoring the tie-breaker. This prevents interference in
the transmission of signals.
Conductor cross-section: 0.2 mm2 ... 2.5 mm2
Connect the DigIn − and BatVtgOut − connections within
the Sunny Island inverter.
K
Sunny Remote Control data
cable
Sunny Island: Connection Display
L
Speedwire network cable
Sunny Island: Connection ComETH
The Speedwire data module (SWDMSI-NR 10) must be installed in the
Sunny Island in order to connect the router/switch (see Installation
instructions for the Speedwire data module SWDMSI-NR 10).
The ComETH connection is located on the data module.
M
Battery management data
cable
Sunny Island: ComSync In
Batterie: CAN SMA
SMA, SUNNY ISLAND and SUNNYPORTAL are registered trademarks of SMA Solar Technology AG in many countries
N
Data cable for internal
communication within the
Cluster
Sunny Island: ComSync Out connection
Internal communication bus connection from Slave 1
E.IA. .ENG-
TS
A.6
Содержание TS Series
Страница 1: ...Installation instructions TS series ...
Страница 2: ......
Страница 9: ...7 www tesvolt com 7 Technical data sheet E IA ENG TS A 6 OFF GRID OR ON GRID ...
Страница 12: ...Sunny Island connection 10 www tesvolt com E IA ENG TS A 6 ...
Страница 45: ......