Содержание POWERWALL 2 AC
Страница 1: ...Powerwall 2 AC Installation Manual with Backup Gateway...
Страница 3: ......
Страница 4: ......
Страница 5: ......
Страница 6: ...IMPORTANT SAFETY INSTRUCTIONS SAVE THESE IMPORTANT SAFETY INSTRUCTIONS Symbols Used...
Страница 7: ...General Information...
Страница 8: ...Environmental Conditions...
Страница 12: ...Figure 2 Powerwall 2 Mounting Bracket Dimensions...
Страница 13: ...Powerwall Dimensions and Space Requirements Figure 3 Powerwall 2 Dimensions and Space Requirements...
Страница 14: ...Powerwall Recommended Temperature Range Powerwall Installation Requirements...
Страница 15: ...Backup Gateway Installation Requirements Figure 4 Backup Gateway Dimensions...
Страница 17: ...Required Supplies Step 1 Plan the Installation Site...
Страница 18: ......
Страница 19: ...Step 2 Transport and Unpack Powerwall Figure 5 Removing the Mounting Bracket...
Страница 20: ...Figure 6 Removing Powerwall from Its Box Step 3 Anchor the Powerwall Mounting Bracket...
Страница 21: ...Figure 7 Anchoring the Bracket to Wood Studs Figure 8 Anchoring the Bracket to Blocking between Wood Studs...
Страница 22: ...Figure 9 Anchoring the Bracket to Plywood Figure 10 Anchoring the Bracket to Metal Studs...
Страница 24: ...Figure 13 Anchoring the Bracket to Concrete or Masonry Figure 14 Anchoring the Bracket to Channel Strut...
Страница 25: ...Figure 15 Back Cable Entry Port Location Viewed from Front of Powerwall...
Страница 26: ...Figure 16 Back Cable Entry Port Location DETAIL Viewed from Front of Powerwall...
Страница 27: ...Step 4 Prepare Powerwall for Mounting Figure 17 Switching Powerwall Off Figure 18 Removing the Left Side Cover...
Страница 29: ...Step 5 Mount Powerwall on the Bracket Figure 21 Mounting Powerwall on the Bracket...
Страница 30: ...Figure 22 Leveling Powerwall with a Shim...
Страница 31: ...Step 6 Prepare the Backup Gateway for Mounting Figure 23 Removing the Dead Front Panel from the Enclosure...
Страница 32: ...Figure 24 Rotating the Back Panel Assembly in the Enclosure Figure 25 Rotating the Dead Front Panel Insert...
Страница 33: ...Step 7 Mount the Backup Gateway Figure 26 Backup Gateway Mounting Hole Locations Back View...
Страница 34: ...Figure 27 Mounting the Backup Gateway...
Страница 36: ...Figure 30 Powerwall 2 AC Side Cable Port Entry location...
Страница 37: ...Figure 31 Communication Connector Wiring...
Страница 39: ...Figure 34 Connector with Terminating Resistor Figure 35 Powerwall Communication Termination...
Страница 40: ...Step 9 Connect a Demand Response Controller Australia and New Zealand only...
Страница 41: ...Step 10 Make AC Power Connections Figure 36 Backup Gateway Power Connectors...
Страница 42: ...Figure 37 AC Power Harness Figure 38 Powerwall 2 AC Power Harness Connection...
Страница 43: ...Step 11 Install Energy Metering for the System Figure 39 Meter Communication Port Connection on Top of Meter...
Страница 44: ...Figure 40 Meter Communication Wiring...
Страница 46: ...Figure 43 Voltage Line Harness EU to AUS Conversion...
Страница 47: ...Figure 44 Voltage Tap Port left and four CT Ports right on Bottom of Meter...
Страница 48: ...o o o Figure 45 CT Orientation in Relation to Power Flow...
Страница 49: ...Figure 46 Multiple Conductors Passing Through a Single CT Figure 47 Y Cable Connecting CTs...
Страница 50: ......
Страница 51: ...Figure 48 CT Placement for Whole Home Backup Single Phase Service...
Страница 52: ......
Страница 56: ...Step 12 Close the Wiring Compartments and Turn On the System Figure 52 Switching Powerwall On...
Страница 57: ...Step 13 Commission the System...
Страница 58: ......
Страница 59: ...o o o o o o o o o o o...
Страница 60: ...Step 14 Finish and Demonstrate the Installation...
Страница 61: ...Troubleshooting...
Страница 62: ...Technical Support Maintenance...
Страница 63: ...Wiring Reference Powerwall...
Страница 64: ...Backup Gateway...
Страница 65: ...Revision Log...