
INSTALLATION STEPS
STEPS 1, 2, 3: Preparing and Mounting the Wirebox
This procedure has 4 different variations depending on the chosen wire entry option, but the general order
of steps will be the same for all wire entry options:
1. Drill 5 mm holes into the wirebox*. If wiring for rear entry, use step bit.
2. Use cardboard template to plan or drill pilot holes into mounting surface*. A 2.5 mm pilot hole is
recommended for most surfaces.
NOTE:
Drill larger pilot holes that can accommodate 6 mm wall plugs if installing on concrete,
masonry, or similar materials.
NOTE:
Installer can adjust pilot hole size based on mounting surface
NOTE:
Use a level to ensure that the template is completely level.
3. Attach wirebox to mounting surface using included fasteners, which include an integrated sealing
washer. The fastener head is compatible with both #2 Phillips or #2 square head bit. Attach conduit/
fittings and bring in conductor wires*.
NOTE:
It is the responsibility of the installer to select appropriate conduit/fitting materials for the
installation.
*
Exact locations depend on the wire entry option
Table 4. For Top Wire Entry
For Top Entry
1
2
3
Table 5. For Bottom Wire Entry
For Bottom Entry
1
2
3
22
Gen 3 Wall Connector Manual
Содержание Gen 3
Страница 1: ...Gen 3 Wall Connector Manual Type 2 Handle Three Phase ...
Страница 35: ...Revision 1 0 ...
Страница 37: ... O O ...
Страница 38: ......
Страница 39: ...NOTE NOTE ...
Страница 40: ......
Страница 41: ...Figure 3 Charging equipment separated from the TN C S PME supply earth by an isolating transformer ...
Страница 42: ...Figure 4 Charger converted to TT ...