September 2016
Service and Repair Manual
Manifolds
Part No. 1268528
Z-40/23N, Z-40/23N RJ
55
4 Move and hold the secondary boom toggle
switch in the down direction.
Result: The pressure gauge shows 1100 psi
/76 bar. Continue to step 6.
Result: The pressure gauge does not show
1100 psi / 76 bar. Continue to step 5.
Note: Do not activate the function enable toggle
switch while making this adjustment.
5 Move and hold the secondary boom toggle
switch in the down direction. Momentarily
activate the platform level toggle switch in the
up direction to increase the relief pressure or
in the down direction to decrease the relief
pressure. Repeat this procedure beginning
with step 4.
Note: Momentarily activating the platform level
toggle switch will increase or decrease the relief
pressure in increments of approximately 50 psi /
3 bar.
6 Move and hold the jib boom toggle switch in
the up direction.
Result: The pressure gauge shows 2100 psi
/124 bar. Continue to step 8.
Result: The pressure does not show 2100 psi
/124 bar. Continue to step 7.
Note: Do not activate the function enable toggle
switch while making this adjustment.
7 Move and hold the jib boom toggle switch in
the up direction. Momentarily activate the
platform level toggle switch in the up direction
to increase the relief pressure or in the down
direction to decrease the relief pressure.
Repeat this procedure beginning with step 6.
Note: Momentarily activating the platform level
toggle switch will increase or decrease the relief
pressure in increments of approximately 50 psi /
3 bar.
8 Move and hold the primary boom toggle switch
in the retract direction.
Result: The pressure gauge shows 2500 psi
/172 bar. Continue to step 10.
Result: The pressure gauge does not show
2500 psi / 172 bar continue to step 9.
Note: Do not activate the function enable toggle
switch while making this adjustment.
9 Move and hold the primary boom toggle switch
in the retract direction. Momentarily activate
the platform level toggle switch in the up
direction to increase the relief pressure or in
the down direction to decrease the relief
pressure. Repeat this procedure beginning
with step 6.
Note: Momentarily activating the platform level
toggle switch will increase or decrease the relief
pressure in increments of approximately 50 psi /
3 bar. To exit programming mode:
10 Move and hold the drive enable toggle switch
in the left direction until the display returns to
SYSTEM READY mode.
Содержание Genie Z-40/23N
Страница 20: ...Service and Repair Manual September 2016 Specifications 10 Z 40 23N Z 40 23N RJ Part No 1268528 ...
Страница 63: ...September 2016 Service and Repair Manual Manifolds Part No 1268528 Z 40 23N Z 40 23N RJ 53 ...
Страница 103: ...September 2016 Service and Repair Manual Power Cable Diagram Part No 1268528 Z 40 23N Z 40 23N RJ 93 ...
Страница 110: ...Service and Repair Manual September 2016 100 Z 40 23N Z 40 23N RJ Part No 1268528 This page intentionally left blank ...
Страница 111: ...September 2016 Service and Repair Manual 101 Electrical Schematic Chassis ...
Страница 112: ...Service and Repair Manual September 2016 102 Z 40 23N Z 40 23N RJ Part No 1268528 Electrical Schematic Chassis ...
Страница 113: ...September 2016 Service and Repair Manual Part No 1268528 Z 40 23N Z 40 23N RJ 103 Electrical Schematic Ground Controls ...
Страница 114: ...Service and Repair Manual September 2016 104 Electrical Schematic Ground Controls ...
Страница 115: ...September 2016 Service and Repair Manual 105 Electrical Schematic Platform Controls ...
Страница 117: ...September 2016 Service and Repair Manual Part No 1268528 Z 40 23N Z 40 23N RJ 107 Ground Control Box Wiring Diagram ...
Страница 118: ...Service and Repair Manual September 2016 108 Ground Control Box Wiring Diagram ...
Страница 119: ...September 2016 Service and Repair Manual 109 Platform Control Box Wiring Diagram ...
Страница 120: ...Service and Repair Manual September 2016 110 Z 40 23N Z 40 23N RJ Part No 1268528 Platform Control Box Wiring Diagram ...
Страница 122: ...Service and Repair Manual September 2016 112 Platform Control Box Wiring Diagram Options ...
Страница 123: ...September 2016 Service and Repair Manual 113 Hydraulic Schematic ...
Страница 125: ......