Service and Repair Manual
September 2016
Primary Boom Components
38
Z-40/23N, Z-40/23N RJ
Part No. 1268528
5 Support and slide the extension tube and
extension cylinder assembly out of the boom
tube.
Crushing hazard. The boom
extension tube could fall when
removed from the boom if not
properly supported.
Note: During removal, the overhead crane strap will
need to be adjusted for proper balancing.
6 Remove the external snap rings from the
extension cylinder rod-end pivot pin at the
platform end of the extension tube. Use a soft
metal drift to remove the pin.
7 Support and slide the extension cylinder out of
the base end of the extension tube. Place the
extension cylinder on blocks for support.
Crushing hazard. The extension
cylinder could become
unbalanced and fall when
removed from primary boom
extension tube if not properly
supported.
Note: During removal, the overhead crane strap will
need to be adjusted for proper balancing.
4-3
Primary Boom Lift Cylinder
The primary boom lift cylinder raises and lowers
the primary boom. The primary boom lift cylinder is
equipped with a counterbalance valve to prevent
movement in the event of a hydraulic line failure.
How to Remove the Primary
Boom Lift Cylinder
Bodily injury hazard. This
procedure requires specific repair
skills, lifting equipment and a
suitable workshop. Attempting
this procedure without these skills
and tools could result in death or
serious injury and significant
component damage. Dealer
service is strongly recommended.
Note: When removing a hose assembly or fitting,
the O-ring (if equipped) on the fitting and/or hose
end must be replaced. All connections must be
torqued to specification during installation. Refer to
Specifications,
Hydraulic Hose and Fitting Torque
Specifications.
1 Raise the primary boom to a horizontal
position.
2 Raise the secondary boom until the primary
boom lift cylinder barrel-end pivot pin is above
the turntable covers.
3 Attach a 5 ton / 5000 kg overhead crane to the
primary boom for support.
4 Using the overhead crane, raise the primary
boom slightly to take the pressure off the
primary boom lift cylinder pivot pins.
Содержание Genie Z-40/23N
Страница 20: ...Service and Repair Manual September 2016 Specifications 10 Z 40 23N Z 40 23N RJ Part No 1268528 ...
Страница 63: ...September 2016 Service and Repair Manual Manifolds Part No 1268528 Z 40 23N Z 40 23N RJ 53 ...
Страница 103: ...September 2016 Service and Repair Manual Power Cable Diagram Part No 1268528 Z 40 23N Z 40 23N RJ 93 ...
Страница 110: ...Service and Repair Manual September 2016 100 Z 40 23N Z 40 23N RJ Part No 1268528 This page intentionally left blank ...
Страница 111: ...September 2016 Service and Repair Manual 101 Electrical Schematic Chassis ...
Страница 112: ...Service and Repair Manual September 2016 102 Z 40 23N Z 40 23N RJ Part No 1268528 Electrical Schematic Chassis ...
Страница 113: ...September 2016 Service and Repair Manual Part No 1268528 Z 40 23N Z 40 23N RJ 103 Electrical Schematic Ground Controls ...
Страница 114: ...Service and Repair Manual September 2016 104 Electrical Schematic Ground Controls ...
Страница 115: ...September 2016 Service and Repair Manual 105 Electrical Schematic Platform Controls ...
Страница 117: ...September 2016 Service and Repair Manual Part No 1268528 Z 40 23N Z 40 23N RJ 107 Ground Control Box Wiring Diagram ...
Страница 118: ...Service and Repair Manual September 2016 108 Ground Control Box Wiring Diagram ...
Страница 119: ...September 2016 Service and Repair Manual 109 Platform Control Box Wiring Diagram ...
Страница 120: ...Service and Repair Manual September 2016 110 Z 40 23N Z 40 23N RJ Part No 1268528 Platform Control Box Wiring Diagram ...
Страница 122: ...Service and Repair Manual September 2016 112 Platform Control Box Wiring Diagram Options ...
Страница 123: ...September 2016 Service and Repair Manual 113 Hydraulic Schematic ...
Страница 125: ......