Service Manual
February 2022
Checklist B Procedures
22
GRC
™
Part No. 1314708GT
B-9
Test the Drive Speed – Stowed
Position
Genie specifications require that this procedure be
performed every 250 hours or quarterly, whichever
comes first.
Proper drive function is essential to safe machine
operation. The drive function should respond
quickly and smoothly to operator control. Drive
performance should also be free of hesitation,
jerking and unusual noise over the entire
proportionally controlled speed range.
Note: Perform this procedure with the machine on
a firm, level surface that is free of obstructions.
Note: Perform this procedure with the machine in
the stowed position.
Note: Perform this procedure in high drive mode.
Verify the low speed drive light is off.
1 Create start and finish lines by marking two
lines on the ground 40 feet / 12.2 m apart.
2 Choose a point on the machine (i.e., contact
patch of a tire) as a visual reference for use
when crossing the start and finish lines.
3 Bring the machine to top drive speed before
reaching the start line. Begin timing when
your reference point on the machine crosses
the start line.
4 Continue at full speed and note the time when
the machine reference point crosses the finish
line. Refer to Specifications,
Performance
Specifications
.
B-10
Test the Drive Speed - Raised
Position
Genie specifications require that this procedure be
performed every 250 hours or quarterly, whichever
comes first.
Proper drive function is essential to safe machine
operation. The drive function should respond
quickly and smoothly to operator control. Drive
performance should also be free of hesitation,
jerking and unusual noise over the entire
proportionally controlled speed range.
Note: Perform this procedure with the machine on
a firm, level surface that is free of obstructions.
1 Create start and finish lines by marking two
lines on the ground 40 feet / 12.2 m apart.
2 Raise the platform approximately 4 feet /
1,2 m.
3 Choose a point on the machine (i.e., contact
patch of a tire) as a visual reference for use
when crossing the start and finish lines.
4 Bring the machine to top drive speed before
reaching the start line. Begin timing when
your reference point on the machine crosses
the start line.
5 Continue at full speed and note the time when
the machine reference point crosses the finish
line. Refer to Specifications,
Performance
Specifications
.
Содержание Genie GRC-12
Страница 110: ...Service Manual February 2022 Wiring Diagram Ground and Platform Controls 98 GRC Part No 1314708GT...
Страница 113: ...February 2022 Service Manual 101 Electrical Schematic GRC Options...
Страница 115: ...February 2022 Service Manual 103 Electrical Schematic GRC from GRC11 1000 to GRC11 1078...
Страница 118: ...Service Manual February 2022 106 Electrical Schematic GRC from GRC11 1000 to GRC11 1078...
Страница 119: ...February 2022 Service Manual 107 Electrical Schematic GRC from GRC11 1079 to GRC14 1780...
Страница 122: ...Service Manual February 2022 110 Electrical Schematic GRC from GRC11 1079 to GRC14 1780...
Страница 123: ...February 2022 Service Manual 111 Electrical Schematic GRC from GRC14 1781 to GRC15 2343...
Страница 126: ...Service Manual February 2022 114 Electrical Schematic GRC from GRC15 2344 to GRC16P 2481...
Страница 127: ...February 2022 Service Manual 115 Electrical Schematic GRC from GRC16P 2482 to GRC16P 2562...
Страница 130: ...Service Manual February 2022 118 Electrical Schematic GRC from GRC16P 2563 to GRCP 5999...
Страница 131: ...February 2022 Service Manual 119 Hydraulic Schematic GRC from GRC11 1000 to GRC12 1168...
Страница 135: ......