2 Safety
Operations Manual
Bison 120
20-07-2018
Page 2-16
Revision 2.0
(9) Gas, Dust, Steam, Smoke
Death, serious injury or delayed lung disease may result from breathing dusts that are generated
when certain hazardous materials are crushed, screened or conveyed with this equipment.
Diesel engine exhaust emissions contain products of combustion which may be harmful to your
health. Always operate the machine in a well ventilated area and if operating in an enclosed
area, vent the emissions outside. Do not touch any part of the engine or exhaust system. Allow
the engine and exhaust to cool before performing any repair or maintenance.
Never fill the fuel tank with the engine running, while smoking or when near an open flame. Never
overfill the tank or spill fuel. If fuel is spilled, clean it up immediately.
Observe the regulations in force at the respective site.
Dust found on the machine or produced during work on the machine should be removed by
extraction, not blowing. Dust waste should be dampened, placed in a sealed container and
marked, to ensure safe disposal.
When dusts are generated by the operation of this equipment, use approved respiratory protection,
as required by Federal, State and Local safety and health regulations.
Carry out welding, flame cutting and grinding work on the machine only if this has been expressly
authorised, as there may be a risk of explosion and fire.
Before carrying out welding, flame cutting and grinding operations, clean the machine and
its surroundings from dust and other flammable substances and make sure the premises are
adequately ventilated as there may be a risk of explosion.
Ensure operators wear a suitable face mask where exposed to possible harmful effects of air
pollution of any kind.
(10) Hazardous Substances
Ensure that correct procedures are formulated to safely handle hazardous materials by correct
identification, labelling, storage, use and disposal.
All hazardous materials must be handled strictly in accordance with the manufacturers instructions
and all applicable regulations observed at all times.
Never fill the fuel tank with the engine running, while smoking or when near an open flame. Never
overfill the tank or spill fuel. If fuel is spilled, clean it up immediately.
(11) Noise Levels
HEARING HAZARD EXCEEDS 90 dB (A)
May cause loss or degradation of hearing over a period of time.
Always ensure that operators are provided with ear defenders of approved pattern and that these
are worn at all times when the machine is operating.
Содержание Evoquip Bison 120
Страница 2: ...EvoQuip 200 Coalisland Road Dungannon Co Tyrone BT71 4DR Telephone 44 0 28 8774 0701...
Страница 23: ...Operations Manual Bison 120 20 07 2018 Page 2 7 Revision 2 0 Safety 2 Figure 2 1 Location of Safety Signs...
Страница 36: ...2 Safety Operations Manual Bison 120 20 07 2018 Page 2 20 Revision 2 0 Intentionally Left Blank...
Страница 42: ...3 Technical Data Operations Manual Bison 120 20 07 2018 Page 3 6 Revision 2 0 Intentionally Left Blank...
Страница 102: ...7 Standard Operating Procedures Operations Manual Bison 120 20 07 2018 Page 7 20 Revision 2 0 Intentioanlly Left Blank...
Страница 116: ...9 Maintenance Operations Manual Bison 120 20 07 2018 Page 9 8 Revision 2 0 Figure 9 2 Grease Points Cont...
Страница 196: ...10 Troubleshooting Operations Manual Bison 120 20 07 2018 Page 10 22 Revision 2 0 Intentionally Left Blank...
Страница 197: ...Storage 11 Operations Manual Bison 120 20 07 2018 Page 11 1 Revision 2 0 Table of Content 11 Storage 11 2...
Страница 204: ...Operations Manual Bison 120 20 07 2018 Page 12 6 Revision 2 0 12 Glossary of Terms Intentionally Left Blank...
Страница 206: ...Appendix Operations Manual Bison 120 20 07 2018 Page 13 2 Revision 2 0 Intentionally Left Blank...
Страница 208: ...Appendix A Operations Manual Bison 120 20 07 2018 Page A 2 Revision 2 0...
Страница 214: ...Appendix B Operations Manual Bison 120 20 07 2018 Page B 6 Revision 2 0 Intentionally Left Blank...
Страница 216: ...Appendix C Operations Manual Bison 120 20 07 2018 Page C 2 Revision 2 0 Intentionally Left Blank...
Страница 218: ...Appendix C Operations Manual Bison 120 20 07 2018 Page C 4 Revision 2 0 b Front Panel CPU Connection Cont...
Страница 219: ...Appendix C Operations Manual Bison 120 20 07 2018 Page C 5 Revision 2 0 c Main Wiring...
Страница 220: ...Appendix C Operations Manual Bison 120 20 07 2018 Page C 6 Revision 2 0 d Relay Box...
Страница 223: ......