Section 3 • Scheduled Maintenance Procedures
3 - 8
AL8000HT Light Tower
Part No. 116478
REV A
September 2008
CHECKLIST
A
PROCEDURES
A-2
Perform Pre-operation
Inspection
Note: Terex specifications require that this
procedure be performed every 8 hours or daily,
whichever comes first.
Completing a pre-operation inspection is essential
to safe machine operation. The pre-operation
inspection is a visual inspection performed by the
operator prior to each work shift. The inspection is
designed to discover if anything is apparently wrong
with a machine before the operator performs the
function tests. The pre-operation inspection also
serves to determine if routine maintenance
procedures are required.
Complete information on how to perform this
procedure is available in the appropriate Operator's
Manual. Refer to the Operator's Manual on your
machine.
A-3
Perform Function Tests
Note: Terex specifications require that this
procedure be performed every 8 hours or daily,
whichever comes first.
Completing the function tests is essential to safe
machine operation. Function tests are designed to
discover any malfunctions before the machine is
put into service. A malfunctioning machine must
never be used. If malfunctions are discovered, the
machine must be tagged and removed from
service.
Complete information on how to perform this
procedure is available in the appropriate Operator's
Manual. Refer to the Operator's Manual on your
machine.
Содержание AL8000HT
Страница 1: ...Service Manual First Edition Rev A Part No 116478 September 2008 AL8000HT TM...
Страница 3: ...September2008 PartNo 116478 AL8000HTLightTower Serial Number Legend iii How to Read Your Serial Number...
Страница 97: ...Section 6 Schematics September2008 PartNo 116478 AL8000HTLightTower 6 15 REV A Hydraulic Schematic...
Страница 99: ......