background image

A rope is 
wound like 
a loop

.

(3)  If the pump is used for hot water circulation through closed piping, fit the piping system with an 

expansion tank, a safety valve, and other devices. Otherwise, the pump may be damaged. 

(4)  If the pump is used as a circulating pump, attach a sluice valve each to the suction and discharge 

sides of the pump. It is not necessary to drain water out of the piping at the time of inspection or 

repair of the pump. 

(5)  Firmly fix the pump with foundation bolts on level foundation concrete. 



(6)  To lift the pump, pass through a rope or other lines to the metal fittings located between the frame 

and the motor, while ensuring that the rope will not catch the terminal box or the coupling of the 

motor. For the models with 7.5kW and over 30kW motor, however, a rope is wound like a loop 

around the casing and passed through the lifting lug to hang it up. If by any chance the pump is   

              scratched, 

repair 

it. 

Note

Securely fix the pump in place with the bolts. Otherwise, it may lead to abnormal 

vibration or other problems. 

Warning

Do not hoist the whole unit using the lifting lugs of the motor, or 
any other parts not intended for the purpose. 

Warning

Before lifting the product, refer to the catalog, dimensional 
drawing, and other documents to check the weight of the product. 
Do not lift the product if its weight exceeds the rated load of the 
hoisting devices. 

Warning

Never use a pump or install parts to it while the pump is lifted. 
Otherwise, it may fall, thus leading to an injury. 

Sluice valve 

Sluice valve

Good 

NG 

Содержание LPE-e

Страница 1: ...you read this manual and understand the content Keep this manual carefully at hand so that it can be consulted at anytime when operating inspecting or maintaining the water supply unit For contractors...

Страница 2: ...the following failures and breakage the costs of the repairs shall be borne by the user 1 Failures and breakage attributable to equipment that was not delivered by Teral Inc 2 Failures and breakage af...

Страница 3: ...afety precautions 1 1 1 3 Location of warning labels and caution labels 1 4 2 Configuration and overview of the pump 2 1 2 1 Before using the pump 2 1 2 2 Model type description 2 1 2 3 Part names and...

Страница 4: ...tes information that is in particular to be noted or emphasized These graphic symbols indicate existing hazards to beware of 1 2 Safety precautions Danger Once the main power is turned on do not touch...

Страница 5: ...ay lead to an injury or damage For overhaul replacement of parts or repairs contact Teral or the service center specified by Teral If unskilled personnel carry out work that requires special knowledge...

Страница 6: ...use burns Once you turn off the power wait until the pump stops completely Do not restart the pump until it does Otherwise the main shaft may be subjected to an excessive load which makes the service...

Страница 7: ...em with a new one The drawing shows representative model Be sure to check the label put on the actual products When lifting the pump pass through a rope or other lines to the metal fittings 11 22kW ou...

Страница 8: ...ntation not upside down Pay special attention to nails especially when opening a wooden crate Otherwise you may get injured Note After the unpacking ask the waste disposal company to dispose of packag...

Страница 9: ...ing to pressurize the liquid used Motor Shaft coupling Shaft coupling guard Pump main shaft Shaft seal mechanical seal Air vent plug Drain plug Hanging metal fitting 11 22kW Warning Be sure to put a s...

Страница 10: ...osed Shaft seal Mechanical seal Bearing Sealed ball bearing Material Refer to the specifications including the internal structure drawing Motor Type Totally enclosed fan cooled for outdoor type Number...

Страница 11: ...3 8 4 5 G 37 1 0 1 9 2 3 3 0 3 8 5 4 150 K 15 22 2 0 2 5 4 0 4 1 6 5 6 8 30 2 0 2 7 4 0 4 6 7 0 10 1 J C 37 45 2 0 2 5 4 0 4 0 7 0 7 9 F C 55 90 1 8 2 8 5 0 5 3 8 0 9 7 200 K 37 45 4 0 4 0 8 0 7 9 11...

Страница 12: ...n head suction height suction pipe resistance will comply with the formula specified in the 2 6 Total suction head However the total suction head decreases as the liquid temperature increases In gener...

Страница 13: ...t catch the terminal box or the coupling of the motor For the models with 7 5kW and over 30kW motor however a rope is wound like a loop around the casing and passed through the lifting lug to hang it...

Страница 14: ...s 3 2 Installation procedure 1 The area and thickness of the foundation concrete must be large enough to withstand the pump weight and the operating load 2 Make foundation holes in advance according t...

Страница 15: ...of the pump 4 Do not install any elbow near the suction port or the discharge port of the pump This will reduce the performance and efficiency 5 The suction pipe must be made as short and straight as...

Страница 16: ...s Do not attach a sluice valve to the suction pipes Do not install the piping with a shape of upward bend i e providing the piping with a rising gradient and then a descending gradient To prevent air...

Страница 17: ...ignite Furthermore since the mechanical seal needs to be replaced periodically install detachable insulation for it Warning Never install heat insulation to the motor section Otherwise the motor may h...

Страница 18: ...and an overload protection device on the primary power side of the pump When switching from an IE1 motor equipped product it is necessary to verify the applicability of its ground fault interrupter an...

Страница 19: ...ve a motor equipped with a self protecting device When driving a 400V class motor contact your nearest office of Teral In some cases it might be necessary to take measures for inverter surge An invert...

Страница 20: ...cover or a filter over the motor The temperature may rise inside the motor thus leading to failures Caution Do not allow a large amount of foreign matter to enter the pump Failure to observe this may...

Страница 21: ...ater do not carry out the above procedure with bare hands because hot water may spout out of the air vent cock thus leading to burns Caution Never run the pump dry operation without priming Failure to...

Страница 22: ...ause it may cause a failure 2 Turn on the power to start the pump 3 During the initial period of pump operation and circulation gradually open the sluice valve on the discharge side to circulate liqui...

Страница 23: ...otation speed min 1 Standard vibration value at the bearing section For reference only Relation between the total amplitude a and the vibration velocity V a 9 Q a Total amplitude m V Vibration velocit...

Страница 24: ...s Use bearings into which urea grease is filled Using other type of grease such as lithium grease may shorten the service life f Since mechanical seal is used as the shaft seal high frequency sound me...

Страница 25: ...ting pressure and other factors and the service life changes accordingly 3 If there is any water leakage at the mechanical seal replace it During the initial period of running a new pump a small amoun...

Страница 26: ...work screw the bolt into the Remove the mechanical seal fastening ring removal tap B and remove the main shaft from the main shaft Remove the seal cover and O ring If it is difficult to work screw th...

Страница 27: ...he shaft coupling to the main shaft supplied with the product At this point temporarily fix the shaft coupling Remove the crowbar but do not tighten it Be careful not to pinch your hands 5 6 Uniformly...

Страница 28: ...cating grease in bearings Use bearings into which urea grease is filled Using other type of grease such as lithium grease may shorten the service life Bearing type Output kW Bearing Load side Unload s...

Страница 29: ...h and uniform 9 Bearing Motor 2 Heat generation noise vibration Touch Listen Visual check No abnormal condition 5 1 9 2 3 years after 15000 hours operation Mechanical seal Leakage Visual check No leak...

Страница 30: ...f the pipes to reconsider the specifications The piping is clogged with foreign matter Check and clean the piping The impeller and the liner ring are worn Contact Teral or our servicing companies beca...

Страница 31: ...thus leading to imbalanced load A rotating part is in contact with another part The main shaft is winding Abnormal noise from the shaft seal mechanical seal 5 1 The motor is running in open phase con...

Страница 32: ...Head Office 230 Moriwake Miyuki cho Fukuyama city Hiroshima 720 0003 Japan Tel 81 84 955 1111 Fax 81 84 955 5777 www teral net 2018 07 TP 534 01...

Отзывы: