0101-8604-0, Rev. F
3-1
FC-3800 F & I Guide
3 Unpacking and Installation
This section provides information and guidance about what to do with your new system
when it has arrived on site, but prior to installation.
The customer is responsible for unpacking and preparing the site, as outlined in
sections 3.1 and 3.2.
Temescal is responsible for making equipment interconnections and for energizing
and testing the equipment prior to acceptance, as described in section 3.3.
This section contains the following subsections:
3.1 Unpacking by Customer
3.2 Customer Site Preparation Responsibilities
3.3 Temescal Installation Responsibilities
3.4 Installation Drawings
3.1
Unpacking by Customer
3.1.1 Un crating
The equipment described in this F& I Guide and listed in the shipping documents was
released to the carrier in good condition and properly packed. It is essential to all
concerned that the contents of the shipment be examined carefully when it is unpacked,
to make sure that no damage has occurred in transit. First check the materials received
against the packing list to be certain that all elements are accounted for. Then check
each component for damage.
Normally, the major components of the system as shipped will be:
V acuum cubicle
Operator station
Power distribution box
Mechanical (i.e., roughing) pump
Cryopump compressors
Optional blower pump
Simba 2
®
power module (only with Simba 2 power supply)
Optional control console (only with Simba 2 power supply)
Other accessories as specified
CAUTION
Many smaller items are packed separately, as indicated on your packing list.
These items may include ionization gauge tubes, cables, substrate carrier,
piping, and fittings.
In discarding packing materials, take care to avoid losing
any such parts. Wait to discard packing materials until after the initial system
startup procedure.