CAT-M1 SOLAR ASSET TRACKING UNIT INSTALLATION GUIDE
Страница 1: ...CAT M1 SOLAR ASSET TRACKING UNIT INSTALLATION GUIDE ...
Страница 2: ...propyl rubbing alcohol Clean rag 7mm Socket or wrench 4 sheet metal screws INSTALLATION STEPS The optimal installation location is high on the nose of the trailer away from the corner and just below the top rail The ideal position 4 sheet metal screws Has the GPS antenna facing upwards Allows sunlight to reach the solar panel Is at a higher height on the asset where it remains cleaner than lower l...
Страница 3: ...switch down 4 Carefully mark where each of the four mounting holes should be drilled 5 Drill each of the 4 holes using the required drill bit 6 Place weatherproof caulk around each of the four mounting holes 7 Screw the device to the trailer using the screws starting with the top mounting holes 8 Clean up any excess caulk IMPORTANT Remove the device and do not complete installation if it cannot be...