2.3.3
Cable connection between Main board and DUT thimble
Telink provides six HDMI cables. HDMI connector on each test site of the Main
board should be connected with a thimble board‘s HDMI connector via a HDMI
cable.
If DUT is a device board with flash, up to four cables should be connected
between a thimble board and a DUT.
Table 1 Cable connection between thimble board and DUT with flash
Connection points on
thimble board
Connection points on DUT
3V3D
BAT+
GND
BAT-
SWM
SWS
P45*
Wakeup GPIO*
*Note: Wakeup test supports two methods including timer wakeup and GPIO
wakeup.
1)
If using timer wakeup, it’s not needed to connect P45 of thimble board with
DUT’s wakeup GPIO.
2)
If using GPIO wakeup, it’s needed to connect P45 of thimble board with
DUT’s wakeup GPIO.
If DUT is a device board with OTP, up to five cables should be connected
between a thimble board and a DUT.
Table 2 Cable connection between thimble board and DUT with OTP
Connection points on
thimble board
Connection points on DUT
3V3D
BAT+
GND
BAT-
SWM
SWS
P45*
Wakeup GPIO *
VPP
VPP
*Note: Wakeup test supports two methods including timer wakeup and GPIO
wakeup.
1)
If using timer wakeup, it’s not needed to connect P45 of thimble board with
Telink