Telguard TG-7FP Installation & Operating Guide
2
56052401 Rev A
Information Related to Software Settings
NOTICE TO USERS, INSTALLERS, AUTHORITIES HAVING JURISDICTION, OTHER INVOLVED PARTIES
FIRE SYSTEM INSTALLATIONS: This product incorporates field-programmable software. In order to
comply with the requirements in the Standard for Control Units and Accessories for Fire Alarm Systems,
UL 864, and/or Standard for Equipment for Fire Signal Receiving Centres and Systems, ULC-S559, certain
programming features or options must be limited to specific values or not used at all as indicated below.
Program feature or option
Permitted in
UL 864?
(Y/N)
Possible settings
Settings permitted in
UL 864
Link Supervision when used
as a Sole Path
Y
Disabled, 200 seconds,
5 minutes, 60 minutes
200 seconds, 5 minutes, 60
minutes
Automatic Self-Tests when
used with an alternate
communication path
Y
Disabled, 6 hours, Daily,
Weekly, Monthly
6 hours
#
No Service Condition (NSC)
delay
Y
30 seconds, 60 seconds,
3-, 5- 10-, 20-, 30-, 45-,
60-, 1440- minutes
No more than 3 minutes
Program feature or option
Permitted in
ULC-S559?
(Y/N)
Possible settings
Settings permitted in
ULC-S559
Link Supervision
Y
Disabled, 180 seconds
180 seconds
No Service Condition (NSC)
delay
Y
30 seconds, 60 seconds,
3-, 5- 10-, 20-, 30-, 45-,
60-, 1440- minutes
No more than 60 seconds
#
6 hours is specified in UL 864 10
th
Edition (published in 2014); the 9
th
Edition (published in 2003)
specified 24 hours (daily).
BURGLARY SYSTEM INSTALLATIONS: In order to comply with the requirements in the Standard for
Central-Station Burglar-Alarm Units, UL 1610 and Standard Line Supervision, the TG-7FP must meet these
requirements:
The TG-7FP communicator must be used in one of the following configurations:
•
As a primary communicator, single line-200 second supervision; or
•
As a secondary communicator line for a DACT (supervision not required). Every 24 hours, a check-in
signal must be sent from the communicator to the central station over the primary dialer and each
communication path shall be monitored for integrity (DACT shall have line monitoring enabled and the
TG-7FP shall have cellular connection supervision enabled).