
FT
100S
3-1
Chapter 3
Hardware Configuration
GENERAL
The FT 100S is factory configured to current industry standards.
Because of the number of possible applications, the unit will require
some option changes to fit a particular application.
This chapter describes the options that are configured with hardware on
the printed circuit board (PCB). Hardware options are selected by two
plug-on straps, a dip switch, and installing the interface adapter card. To
access these options on the standalone unit, the cover must first be
removed.
COVER REMOVAL
Warning
Do not remove the cover unless the power cord is
unplugged.
1. Place the unit on its side on a flat surface.
2. Insert a medium size flat screwdriver blade in one of the
bottom rear latch slots. Do not push the screwdriver but
lightly pry the handle away from the unit as shown in
Figure 3-1. This disengages the lock prong from the latch
locks.
3. Assist removal by pushing the cover from the chassis with
your fingers on the unit rear edges. Repeat this procedure
with the remaining latch slots.
4. To replace the cover, align the latch locks, rear guide
grooves, and front lock tabs.
5. Press the cover in place until the latch locks engage the
lock prongs.
Содержание FT100 S
Страница 10: ...ESF Framing C 4 Framing Format Conversion C 6 Performance Monitoring C 6 Service and Support...
Страница 22: ...Installation 2 8 FT 100S...
Страница 28: ...Hardware Configuration 3 6 FT100S...
Страница 106: ...Control Port Operation 6 28 FT 100S...
Страница 108: ...Maintenance 7 2 FT 100S...
Страница 116: ...Specifications A 4 FT 100S...
Страница 120: ...Control Port Command Quick Reference B 4 FT 100S...
Страница 128: ...T1 Overview C 8 FT 100S...