08354B DCN7877
Teledyne API T640 PM Mass Monitor
32
4.
Plug the ASC connector into the proper fitting on the rear panel of the T640.
5.
Connect the power cable and ambient temperature sensor at back of
instrument.
6.
Before sealing the cord grip, power up the instrument and make sure it is
running properly
7.
Perform Ambient Temperature, Ambient Pressure and Flow
check/calibrations (Sections 4.1, 4.2, 4.3) – in that order).
8.
Next, for the 640x option, perform the Bypass Flow verification (and
calibration if necessary) (Section 4.4); if no option, skip to next step.
9.
Perform PMT check with SpanDust™ (Section 4.5).
10.
Last, perform the Leak Check (Section 4.6).
11.
Once the T640 instrument is determined to be installed and working properly,
tighten up the cord grip around the ASC.
12.
Apply
clear silicone caulk
generously around the top end of where the cord
grip rubber grommet meets the ASC to ensure complete sealing from the
weather.
•
Silicone caulk seals well and can easily be removed and reapplied if the
instrument needs to be removed for servicing.
T640:
640x
:
Figure 2-21. T640 (left) and 640x (right) Outdoor Enclosures Assembled