WorkHorse Rio Grande ADCP User's Guide
P/N 957-6167-00 (January 2001)
page 19
11 Deployment
Guide
Use the following steps and the Quick Reference card to setup the Work-
Horse for a deployment.
11.1 Deployment
Checklist
Test the ADCP using
DumbTerm
Seal the ADCP for deployment
Install new o-rings; use silicone lubricant
Use fresh desiccant (2 bags) inside ADCP
Visually inspect the ADCP
Check the transducer head condition
All mounting hardware installed
Transducer faces clean and free from defects
Verify compass alignment using
DumbTerm
; if necessary, re-calibrate
Are biofouling precautions needed?
Zero pressure sensor (optional) at deployment site with AZ-command
TRANSDUCER HEAD
CHECK O-RINGS
AND MOUNTING
HARDWARE ARE
INSTALLED
ELECTRONICS
CHECK ALL HARDWARE
IS TIGHT
END-CAP
CHECK O-RINGS AND
MOUNTING HARDWARE
ARE INSTALLED
I/O CABLE CONNECTOR
CONNECT I/O CABLE
HOUSING
CHECK FOR
CRACKS
URETHANE TRANSDUCER FACES
REMOVE BARNACLES AND
CHECK FOR CRACKS
VISUALLY INSPECT THE ADCP
Figure 7.
Visual Inspection before Deployment
Содержание WorkHorse Rio Grande ADCP
Страница 2: ......