84
Teledyne API T500U CAPS NO
2
Analyzer with NumaView™ Software
083730510A DCN8172
Table 5-1. Maintenance Schedule
ITEM
ACTION
FREQ
CAL
CHECK
REQ’D
DATE PERFORMED
TEST
functions
Review and
evaluate
Weekly
No
Zero/span
check
Evaluate
offset and
slope
Weekly
No
Zero/span
calibration
Zero and
span
calibration
Every 3 months
Yes
Sample filter
Change
sample filter
Annually (may
need more
frequently in a
high dust load
environment)
No
AREF filter
and charcoal
filter
Change both
Annually
Yes
Spectrometer
mirrors
Contact
Technical
Support
As necessary
due to
excessive
Measured Loss
Yes
Pneumatic
sub-system
Check for
leaks in gas
flow paths
Annually or
after repairs
involving
pneumatics
Yes if a
leak is
repaired
Internal Pump
Replace
Measured Flow
less than
800 cm
3
/min
Yes
PREDICTIVE DIAGNOSTICS
Predictive diagnostic functions, including failure warnings and alarms built into the
analyzer’s firmware, aid in determining whether and when repairs are necessary.
Dashboard Functions can also be used to predict failures by looking at how their values
change over time, compared to the values recorded on the printed record of the
Final Test
and Validation Data Sheet
. The internal data logger is a convenient way to record and track
these changes (set up through the Data Logger, Section 2.5.1). Use NumaView™ Remote
to download and review this data from a remote location.
The following table, checked weekly, can be used as a basis for taking action as these
values change with time.
Содержание T500U
Страница 2: ......