56
Operation description
Required tool
Approximate timing
Primary circuits contact resistance check
ISM shall be closed before the test,
there should not be any external circuits
connected to ISM main terminals that
provide parallel circuit with the ISM
main circuits otherwise tests will be
invalid.
Visual check, no tool is required
1 minute
Test equipment shall be connected to
ISM main circuits terminals according to
Figure 81 in order exclude any
additional contact resistance and to
decrease measurement error. Main
contact resistance shall be measured by
appropriate equipment at test current
not less than 50 A.
Resistance mesurement test equipment
with test current not less than 50 A
10 minutes
Measured values must not exceed limits
specified in Table 1.
Visual check, no tool is required
-
Figure 80
The Vacuum integrity and solid insulation test installation
After above listed tests were performed successfully the VCB can be put into operation.
Содержание TAVRIDA ELECTRIC VCB15 LD
Страница 1: ...VCB Vacuum Circuit Breaker 17 5kV 31 5kA 2000A 24kV 16kA 800A User Guide...
Страница 3: ...1 Product description...
Страница 7: ...2 Nameplates and seals...
Страница 11: ...3 Product handling...
Страница 23: ...4 Installation...
Страница 50: ...5 Commissioning...
Страница 57: ...6 Operation...
Страница 61: ...7 Maintenance and troubleshooting...
Страница 66: ...8 Disposal...
Страница 68: ...Appendix 1 Product range...
Страница 71: ...Appendix 2 Overall drawings...
Страница 74: ...75 ISM15_LD_3 Weight 13 kg ISM15_LD_6 PCD 133 mm Weight 55 kg...
Страница 81: ...82 ISM25_LD_2 1 PCD 150 mm Weight 35 kg ISM25_LD_2 2 PCD 150 mm Weight 37 kg...
Страница 85: ...Appendix 3 Secondary schemes...
Страница 86: ...87...
Страница 87: ...88...
Страница 88: ...89...
Страница 89: ...90...
Страница 90: ...91...
Страница 91: ...92...
Страница 92: ...93...