Getting Started
75
Ω
BNC cable
75
Ω
Termination
Procedure.
1.
Install the module into the TG700 mainframe. (See page 1-9.)
2.
Power on the TG700 mainframe by connecting it to the power source. The
initialization process for all installed modules is executed.
3.
Check that no error messages appear on the LCD display.
4.
Warm up the instrument for 20 minutes.
5.
Press the front-panel
MODULE
button until the AG7 main menu as shown
below appears.
6.
Connect the
1+2
connector to the digital audio monitor using the 75
Ω
BNC
cable.
7.
Set the digital audio monitor to display the status for the audio data.
8.
Check that any CRC error does not appear on the monitor.
9.
Change the BNC cable from the
1+2
connector to the
3+4
connector, and
check that no CRC errors appear on the monitor.
10.
Change the BNC cable from the
3+4
connector to the
5+6
connector, and
check that no CRC errors appear on the monitor.
11.
Change the BNC cable from the
5+6
connector to the
7+8
connector, and
check that no CRC errors appear on the monitor.
12.
Change the BNC cable from the
7+8
connector to the
SILENCE
connector,
and check that no CRC errors appear on the monitor.
13.
Connect the
48 kHz CLOCK
connector to the oscilloscope CH1 input using
the 75
Ω
BNC cable and 75
Ω
termination.
14.
Check that the appropriate clock signal is displayed on the screen.
AGL7 Module Functional
Check
Use the following procedure to check that the AGL7 Analog Genlock module
is functional.
Required Equipment.
TV signal generator
NTSC/PAL waveform monitor
1–14
TG700 TV Signal Generator Platform User Manual
Содержание TG700
Страница 1: ...xx TG700 TV Signal Generator Platform ZZZ User Manual P071197003 071 1970 03...
Страница 2: ......
Страница 27: ...Getting Started...
Страница 28: ......
Страница 34: ...Getting Started Figure 1 1 Installing the rackmount hardware 1 6 TG700 TV Signal Generator Platform User Manual...
Страница 67: ...Operating Basics...
Страница 68: ......
Страница 111: ...Modules...
Страница 112: ......
Страница 337: ...Index...
Страница 338: ......