ATG7 Analog Test Generator
Operating Procedure
After the ATG7 module is installed in the mainframe, and the mainframe is
installed in the rack or other location where it will be used, use the following
procedure to access each function of the module:
1.
Connect the power cord to the power connector on the rear panel, and then
plug the cord into the AC electric power source. Electric power is supplied
to the mainframe.
2.
Wait until the power-on initialization process is complete, and then check that
there are no error messages on the display.
3.
After the initialization process is complete, the mainframe main menu appears
as shown below.
4.
Press the front-panel
MODULE
button until the ATG7 module main menu
appears as shown below.
5.
Select the signal format and the test signal that you want to output from the
SIGNAL connector. (See page 3-20,
6.
Use the front-panel arrow buttons to navigate and select items in the main
menu and submenus to select the signal format and test signal you want to
output from the BLACK 1, BLACK 2, and BARS connectors, and to set
the other output parameters.
Refer to
ATG7 Module Main Menu
for detailed information about the main menu
and the submenu items. (See page 3-22.)
TG700 TV Signal Generator Platform User Manual
3–19
Содержание TG700
Страница 1: ...xx TG700 TV Signal Generator Platform ZZZ User Manual P071197003 071 1970 03...
Страница 2: ......
Страница 27: ...Getting Started...
Страница 28: ......
Страница 34: ...Getting Started Figure 1 1 Installing the rackmount hardware 1 6 TG700 TV Signal Generator Platform User Manual...
Страница 67: ...Operating Basics...
Страница 68: ......
Страница 111: ...Modules...
Страница 112: ......
Страница 337: ...Index...
Страница 338: ......