Installation
6.
Push
OK Compensate Signal Paths
from
the resulting side-bezel menu.
OK Com-
pensate
Signal
Paths
The calibration will take approximately
10 minutes to complete.
7.
After calibration, verify that the status indicator
on the lower-bezel menu displays
Pass
.
Utility Page
Calibration
Signal Path
Pass
Factory
Pass
If it does not, then recalibrate the instrument
or have the instrument serviced by quali
fi
ed
service personnel.
Service personnel use the factory calibration
functions to calibrate the internal voltage
references of the oscilloscope using external
sources. Refer to your Tektronix
fi
eld of
fi
ce
or representative for assistance with factory
calibration.
NOTE.
Signal Path Compensation does not include calibration to the probe tip. (See page 22, Compensating a Passive Voltage
Probe.)
32
DPO3000 Series Oscilloscopes User Manual
Содержание DPO3000 Series
Страница 1: ...DPO3000 Series Digital Phosphor Oscilloscopes ZZZ User Manual xx www tektronix com 071 2410 01 ...
Страница 4: ......
Страница 16: ...Preface xii DPO3000 Series Oscilloscopes User Manual ...
Страница 39: ...Installation 3 If necessary adjust your probe Repeat as needed DPO3000 Series Oscilloscopes User Manual 23 ...
Страница 50: ...Installation 2 Power off your oscilloscope 34 DPO3000 Series Oscilloscopes User Manual ...
Страница 54: ...Installation 6 Power on the oscilloscope 7 Push Utility 38 DPO3000 Series Oscilloscopes User Manual ...