background image

IL380 Tek-CARE

®

 NC150 & NC200 Manual • iii

Copyright © TekTone Sound & Signal Mfg., Inc. All Rights Reserved.

Table of Contents

A Word about ESD (Electrostatic Discharge)

  . . . . . . . . . . . . . . . . . . . . .

iv

System Operating Instructions

  . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

1

NC150N, NC200N Master Stations

  . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

1

IR150B Staff Stations

  . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

5

IR151B, IR152B Patient Stations

  . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

5

IR155B Patient Stations

  . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

5

SF155B Emergency and SF156B Code Stations

  . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

5

LI150B Duty Stations

  . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

6

LI381 Corridor Lights

  . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

6

LI382. LI382LED Corridor Zone Lights

  . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

6

System Installation

  . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

7

Installation Procedure

  . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

7

Equipment Locations

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

7

Wiring Installation

  . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

8

Housing Installation

  . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

9

Wire Checkout

  . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

10

Wire Connections

  . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

11

Connections Checkout

  . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

11

System Test Instructions

  . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

11

System Checkout and Testing

  . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

12

System Maintenance Instructions

  . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

13

NC150N, NC200N Master Stations

  . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

13

PK151A, PK152 Power & Control Units

  . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

14

IR150B Staff and IR155B Patient Stations

  . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

14

PK800A Secondary Power Supply

  . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

14

FZ151 In-Line Fuse Holder

  . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

15

IR151B, IR152B Patient Stations

  . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

15

SF155B Emergency and SF156B Code Stations

  . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

15

LI150B Duty Stations

  . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

15

LI381 Corridor and LI382 Corridor Zone Lights

  . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

16

Replacement Parts

  . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

16

Illustrations

Figure 1—NC150N and NC200N Control Locations

  . . . . . . . . . . . . . . . . . . . . . . . . . . . .

2

Figure 2—Duty, Staff, Patient, Emergency & Code Station Control Locations

  . . . . . . . . .

4

Figure 3—Master Panel Housing Chart and Wall Cut-Out Details

  . . . . . . . . . . . . . . . . . .

8

Figure 4—Panel Removal and Replacement

  . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

8

Figure 5—Ring and Back Box for IR150B, IR151B, IR152B and IR155B

  . . . . . . . . . . . . .

9

Figure 6—Ring and Back Box for SF155B, SF156B, LI150B,  

LI381, LI382 and LI382LED

  . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

9

Figure 7—SS106 Transformer Installation

  . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

10

Figure 8—NC150N, NC200N Lens, Filter and Lamp Replacement

  . . . . . . . . . . . . . . . .

14

Figure 9—NC150N, NC200N Nurse Call Systems Notes and Electrical Ratings

  . . . . . . .

17

Figure 10—Block Wiring Diagram without Zone Lamps

  . . . . . . . . . . . . . . . . . . . . . . .

18

Figure 11—Block Wiring Diagram with Zone Lamps

  . . . . . . . . . . . . . . . . . . . . . . . . . .

19

Figure 12—NC150N, NC200N Wiring Diagram

  . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

20

Figure 13—NC150N, NC200N, Two Stations in Parallel

  . . . . . . . . . . . . . . . . . . . . . . . .

21

Figure 14—PK153 Wiring Diagram with Smoke Detector

  . . . . . . . . . . . . . . . . . . . . . .

22

Figure 15—PK153 Wiring Diagram with SF156B Code Station

  . . . . . . . . . . . . . . . . . .

23

Figure 16—PK151A or PK152 to PK800A Interconnection

  . . . . . . . . . . . . . . . . . . . . .

24

Figure 17—SK151N Switch Board PCB Assembly

  . . . . . . . . . . . . . . . . . . . . . . . . . . . .

25

Figure 18—SF337C Cross Reference Diagram

  . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

26

Figure 19—SF339 Cross Reference Diagram

  . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

27

Figure 20—NC110N Hookup to NC150N, NC200N

. . . . . . . . . . . . . . . . . . . . . . . . . . . .

28

Содержание Tek-CARE NC150N

Страница 1: ...ation to staff and patient stations as well as emergency signaling and call indication from remote locations Emergency calls are indicated by a rapid pulsing of all audible and visual signals associat...

Страница 2: ...should not be construed as a commitment by TekTone Sound Signal Mfg Inc TekTone Sound Signal Mfg Inc assumes no responsibility or liability for any errors or inaccuracies that may appear in this docum...

Страница 3: ...ons 15 LI381 Corridor and LI382 Corridor Zone Lights 16 Replacement Parts 16 Illustrations Figure 1 NC150N and NC200N Control Locations 2 Figure 2 Duty Staff Patient Emergency Code Station Control Loc...

Страница 4: ...to protect the equipment from electrostatic discharge ESD effects However since the cause is not in the equipment but in the environment further measures are required of the installer and the user to...

Страница 5: ...tation s reset lamp will illuminate To speak to the caller press the talk button while speaking and release to listen When the conversation is complete press the associated station selector button to...

Страница 6: ...from associated remote when illuminated Indicates emergency call from remote when flashing 6 Lamp Test Button ST005D Illuminates all lamps on panel when pressed 7 Telephone Handset TA150N option Lift...

Страница 7: ...at row The remote stations reset lamps will illuminate Group call may be selected for only one row at a time Press the talk button while speaking NOTE Group call serves as a paging function only No re...

Страница 8: ...rd is connected to patient station 7 In Use LED Indicates station is in use when illuminated 8 Reset Switch Cancels the call when pushed to the left 9 Call Cord Places a call when pulled 10 Call Place...

Страница 9: ...cord is replaced in the receptacle Cancel a Call Press the reset button The call placed lamp will go off Improper Operation If the patient station does not operate as described contact qualified serv...

Страница 10: ...teady illumination of the corridor light that is associated with the calling station Improper Operation If corridor light does not operate as described contact qualified service personnel There are no...

Страница 11: ...cur LI150B Duty Stations Locate duty stations as needed and where convenient for operation Location should provide for unobstructed visibility of the call indicator LI381 Corridor Lights Locate corrid...

Страница 12: ...R150B IR151B IR152B and IR155B Station in the system Shielded cable must be used 1cond 22selectiveforeachSF155BEmergencyStationorSF156BCodeStation not used in conjunction with a patient station 4 cond...

Страница 13: ...6 4 5 2 5 Minimum clearance from live parts on the station to dead metal parts to be not less than 0 5 SF155B Emergency and SF156B Code Stations Install single gang ring or single gang ring double gan...

Страница 14: ...sformer primary to power source until entire installation is completed and checked for shorts and grounds Install transformer connection box as shown in Figure 7 Transformer box must be UL approved Mi...

Страница 15: ...VA Transformer Connect wires as shown in Figure 16 Do not connect transformer primary to power source until entire installation is completed and has been checked for shorts and grounds Connections Ch...

Страница 16: ...ed Onthemasterstation selectthecallingstationbypressingtheilluminatedstation selector button and check for the following 1 The station selector lamp should be canceled 2 The call lamp should turn off...

Страница 17: ...it out of selector lamp switch knob Identify filter by room number or other means using dry transfer lettering labels or other similar methods Be sure identified filter is replaced in knob so that le...

Страница 18: ...ishardwired locate the associated breaker and turn it off If a means cannot be established to remove power to the SS100 then contact qualified service personnel and do not proceed further The SS106 po...

Страница 19: ...estore power to the system For repair or replacement of any other parts contact qualified service personnel A list of replacement parts and numbers appears in the Replacement Parts section IR151B IR15...

Страница 20: ...red bulb cover Be sure to place bulb cover over the same bulb from which it was removed Totestlight placecallattheassociatedstation Iflightstilldoesnotwork repeat steps above until corridor lamp and o...

Страница 21: ...C 068 amps LI382LED Corridor Zone Light 24 VDC 08 amps PK800A Secondary Power Supply 24 VAC 60 Hz Wiring Notes 1 Selector switch shown is representative of both NC150N and NC200N Master Stations 2 Ter...

Страница 22: ...y intercom wiring and it should not be ground at multiple locations MASTER STATION PK151N PK151A PK152 POWER CONTROL UNIT 6 18 POINT PAIRS TRUNK 4 18 SS106 TRANSFORMER 2 18 IR STATION SERIES SF STATIO...

Страница 23: ...at multiple locations Figure 11 Block Wiring Diagram with Zone Lamps TRUNK CABLE POINT PAIR SYSTEM ZONE LAMP TO MASTER OVERHEAD VIEW OF HOSPITAL CORRIDOR IR STATION SERIES SF STATION SERIES SF STATION...

Страница 24: ...rminal identifications shown are not in actual order 4 Use shielded cable if not in a metal conduit If shielded cable is used NO 22 NO 18 NO 18 LI382 or LI382LED SF151N SF153N G T2 P SF155B LI381 LI38...

Страница 25: ...0 VA minimum 2 Terminal identifications shown are not in actual order 4 Use shielded cable if not in a metal conduit If shielded cable is used shield wire replaces No 22 No 18 No 18 LI382 LI382LED T2...

Страница 26: ...GREEN L BLUE N U Combined Configuration N O N C Smoke Detector Smoke Detector SWITCH MODULE U N J E TALK LISTEN SELECTOR MODULE TERMINAL MODULE C D P P1 L L X L L X L L X L L X X X X X IR150B 151B 15...

Страница 27: ...BLUE N U Combined Configuration NOTES SWITCH MODULE U N J E TALK LISTEN SELECTOR MODULE TERMINAL MODULE C D P P1 L L X L L X L L X L L X X X X X IR150N 151N 152N 153N 155N P F V Q L G P L Y C X R IR15...

Страница 28: ...upply PK151A PK152 Control unit Fuse Assy Mount within 2 feet of each other Note T1 and T2 inputs when interconnecting PK800A Secondary Power Supply Do not connect SS106 Transformer to PK151A PK152 Gr...

Страница 29: ...IL380 Tek CARE NC150 NC200 Manual 25 Copyright TekTone Sound Signal Mfg Inc All Rights Reserved Figure 17 SK151N Switch Board PCB Assembly...

Страница 30: ...low Green Blue on station P Not used Q Q L V 7 pin connector Purple F NOTE Both jumpers on back of station need to be in up position DRAWING IL380 IL381 SF337C WIRING REV1 091603 1 EMERGENCY Note Both...

Страница 31: ...OTE Both jumpers on back of station need to be in up position Brown Red Orange Yellow Green Blue on station P Not used Q Q L V 7 pin connector Purple F NOTE Both jumpers on back of station need to be...

Страница 32: ...DULE J D E E1 L L L L N N P P CONTROL ENCLOSURE MASTER STATION NC110N SELECTOR MODULE TERMINAL MODULE D J E N PK151A PK152 L L L TO SELECTIVE LAMP WIRE ON NC150N NC200N NC150N NC200N TO PK151A PK152 N...

Отзывы: