background image

 

VOT1; Rev 1.5; EN; 5.11.2015  

TKT66 

– Installation and maintenance 

 

64

 

APPENDIX 8: Menu selections 

 

 

LE

D

D

e

sc

rip

tio

n

0

1

2

3

4

5

6

7

10

1

R

e

p

o

rt

p

rin

re

p

o

rt

2

Te

sti

n

g

Lu

mi
. T

e

st 

sta

rt

Lu

mi
. T

e

st 

ca

n

ce

l

B

att

. T

e

st 

sta

rt 

, 2

/3

 

d

u

ra

ti

o

n

 ti

me

B

att

Te

st 

sta

rt 

fu

ll 

d

u

ra

ti

o

n

 

ti

me

B

att

Te

st 

sta

rt 

, to 

d

e

e

p

 

d

is

ch

ar

ge

 

 limi
t

B

att

Te

st 

ca

n

ce

l /

 

b

att

e

rro

r  

co

n

fir

re

co

n

fig

u

ra

ti

o

n

3

Se

tu

p

Se

tt

in

gs

 lo

ck

e

d

Se

tt

in

gs

 

p

o

ss

ib

le

4

A

u

to 
co

n

f.

n

o

in

 u

se

in

 u

se

5

Te

st 

se

le

ct

fir

st 

d

ig

it,

 lu

mi
n

air

e

 

te

st 

in

te

rv

al

te

st 

e

ve

ry

 d

ay

te

st 

e

ve

ry

 

se

co

n

d

 d

ay

te

st 

e

ve

ry

 

th

ird

 d

ay

te

st 

e

ve

fo

u

rth

d

ay

te

st 

e

ve

ry

 

fif

th

 d

ay

te

st 

e

ve

ry

 

six

th

 d

ay

te

st 

e

ve

ry

 

se

ve

n

th

 

d

ay

se

co

n

d

 d

ig

it

lu

mi
n

air

e

 a

n

d

 

b

att

e

ry

 te

st 

ma
n

u

all

y

lu

mi
n

air

e

 

an

d

 b

att

e

ry

 

te

st 

au

toma

ti

ca

lly

lu

mi
n

air

e

 te

st 

au

toma

ti

ca

lly

b

att

e

ry

 te

st 

ma
n

u

all

y

lu

mi
n

air

e

 

te

st 

ma
n

u

all

y, 

b

att

e

ry

 te

st 

au

toma

ti

ca

lly

6

Se

n

siti

vity

7

Lu

mi
n

air

e

 te

st 

ti

me

8

D

e

la

y ti

me

9

Ce
n

t.

 N

u

mb
e

r

10

B

att

e

ry

 le

ve

l

11

D

u

ra

ti

o

n

12

Ye

ar

s

13

M

o

n

th

s

14

D

ay

s

15

H

u

o

rs

16

M

in

u

te

s

To

 se

ye

ar

. L

as

tw
o

 d

ig

its

 o

f y

e

ar

 (e

.g

. 1

2 =

 2

01

2)

To

 se

mo
n

th

To

 se

d

ay

.

To

 se

h

o

u

r. 2

4h

 sy

ste

m.

To

 se

mi
n

u

te

s.

Se

le

ct

io

n

Se

n

siti

vity

 v

alu

e

 se

le

cti

o

n

 in

 ci

rc

u

it 

mo
n

itor
in

g. 

Se

e

 in

str

u

cti

o

n

s i

n

 ch

ap

te

r 5

.3

.

Lu

mi
n

air

e

 te

st 

ti

me
 se

le

cti

o

n

. P

re

ss

 S

ET

 b

u

tt

o

n

 u

n

ti

l c

o

rre

ct 

ti

me
 is

 se

le

cte

d

. E

.g

. 1

5=

15

.0

0=

3p

m.

D

e

la

y ti

me
 w

h

e

n

 sw

itc

h

in

g f

ro

b

att

e

ry

 o

p

e

ra

ti

o

n

 to 
ma
in

s v

o

lta

ge

. V

alu

e

 in

 mi
n

u

te

s.

Ce
n

tr

al 

B

att

e

ry

 U

n

it 

in

d

iv

id

u

al 

n

u

mb
e

r. U

se

fu

l in

 re

p

o

rts

 a

n

d

 ce

n

tr

al 

mo
n

itor
in

g s

ys

te

ms
.

V

o

lta

ge

 le

ve

l th

at 

b

att

e

ry

 te

st 

stop
s. 

D

e

fa

u

lt 

is

 2

10

V

(re

co

mme

n

d

ati

o

n

). V

alu

e

 is

 2

00

V

 +

 se

le

cti

o

n

. E

.g

. y

o

u

r s

e

le

cti

o

n

 

is

 2

0 -

> b

att

e

ry

 te

st 

stop
 le

ve

l is

 2

00

V

 +

 2

0 V

 =

 2

20

V

.

Se

le

cti

o

n

 o

f d

u

ra

ti

o

n

 ti

me
, 1

h

 o

r 3

h

 b

att

e

ry

 o

p

e

ra

ti

o

n

 ti

me
.

Содержание TKT66

Страница 1: ...VOT1E TKT66 TAPSA CONTROL CENTRAL BATTERY UNIT FOR EMERGENCY LIGHTING Installation and maintenance instructions Made In Finland...

Страница 2: ...4 Parallel connection of output circuits 10 4 5 Control unit 11 4 5 1 Individual luminaire monitoring test with basic settings 11 4 5 2 Circuit monitoring luminaire test with basic settings 11 4 6 Ope...

Страница 3: ...Setup 35 8 1 8 External USB connection 36 8 2 Printer 37 8 2 1 Language selection of the printer TKT66xxC N D L or optional feature TST6631 37 8 2 2 Printing out test reports 37 APPENDIX 1 Report Lay...

Страница 4: ...nit de energized The central battery unit and the battery housing can be opened only by electrically skilled person Device must be made de energized before any maintenance or repair work Remove the ba...

Страница 5: ...KT6608C N P xx 8 220 240 VAC 50 60Hz 1 TKT6616C N P xx 16 220 240 VAC 50 60Hz 1 TKT6624C N P xx 24 220 240 VAC 50 60Hz 1 TKT6608C N P xxF 8 N PE 220 240 VAC 50 60Hz 3 TKT6616C N P xxF 16 N PE 220 240...

Страница 6: ...s connects a voltage of 220 VDC to the non maintained circuits and the voltage supply to the maintained circuit switches from 230 VAC to 220 VDC The battery supply is used as long as the mains voltage...

Страница 7: ...he panel functions are described in Chapter 4 6 Operation of the central battery unit 3 7 Technical specifications Mains connection 220 240 VAC 50 60 Hz 1 or F models N PE 220 240 VAC 50 60 Hz 3 Casin...

Страница 8: ...F1 in the connecting terminal and with battery circuit fuses F2 and F3 The output circuits fuses are on the top end of casing at connectors 1 2 For more information see chapter 5 2 1 Parts layout The...

Страница 9: ...4 108 EC EMC directive EN 61000 6 3 2001 Electromagnetic compatibility EMC Part 6 3 Generic standard Emission standard for residential commercial and light industrial environments EN 61000 6 2 2005 El...

Страница 10: ...switch selector that defines the characteristic of the board The functions of the DIP switches are DIPs 1 3 give the board its internal address DIP 4 defines whether the board uses addressable central...

Страница 11: ...and 4 11 Buttons 4 5 1 Individual luminaire monitoring test with basic settings As a basic setting the luminaire test is done automatically once a day at a predetermined time The central battery unit...

Страница 12: ...menu functions of LEDs 1 and 2 are so called basic functions All other functions are related to the settings of the central battery unit The latter do not need to be changed in normal use When the men...

Страница 13: ...ion Battery fault and Internal fault LEDs are also lit Battery charger is charging batteries with too high voltage Charger is faulty and it must be changed and or Batteries are at the end of their lif...

Страница 14: ...The charging current can be selected from the charging board by using a DIP switch 7 CURRENT LIMIT Not in use 8 BATTERY FAULT Possible fault in the battery or its cabling This LED can be lit with othe...

Страница 15: ...aires Status of the luminaires 2 To indicate selection in menu Instructions how to check and change settings from menu are below Addressable monitoring The LEDs display the status of luminaires in the...

Страница 16: ...ntroller function or the BLINK mode 8 Start the local controller function 9 Start the BLINK mode 10 Reconfiguration To start or interrupt a test 1 Go to the menu with the MENU OK button 2 Press the BR...

Страница 17: ...ual tests 7 segments display The first section in the 7 segment display determines every how often the luminaire test is made from 1 to 7 meaning the number of days If the number is 1 the test is made...

Страница 18: ...changed all the way up to 150 mA In the display this shows as the value 30 When the value 30 is exceeded the following value is the minimum current the change of which the central battery unit notice...

Страница 19: ...ed to a specific central battery unit if there are more than one central battery units in the building To set an individual number for the unit 1 Go to the menu with the MENU OK button 2 Press the BRO...

Страница 20: ...set the system time and date 1 Go to the menu with the MENU OK button 2 Press the BROWSE button until the right led is lit 3 Press the SET button until the value you wish to select shows in the displa...

Страница 21: ...ol unit menu No action needed unless the test fails If the test fails check condition of batteries To run the battery test yourself either 1 Press the BROWSE button for 8 seconds or 1 Press the MENU O...

Страница 22: ...Check the loop between connectors 68 69 FUSE FAULT If the LED is lit there is a faulty fuse in the control module If the LED is blinking slowly there is a faulty fuse in the circuit shown on the disp...

Страница 23: ...anging a desired setting in the menu Press for 3 seconds to start luminaire test Press for 8 seconds to start battery test 1 s V METER Press and hold SET for 1 second the voltage of the battery is dis...

Страница 24: ...y emergency luminaires operating on AC DC voltage However in case of the fluorescent lamp luminaires they shall be designed so that they switch off when the lamp fails This is because the system measu...

Страница 25: ...connected as maintained exit luminaire or Local Controller If you wish to change into non maintained emergency luminaire circuits the Mode link needs to be removed from those circuits Layout for Mode...

Страница 26: ...5 11 2015 TKT66 Installation and maintenance 26 5 2 1 Parts layout Dip switches for XST2618 and XST0201 Mode links Battery fuses F2 and F3 Distribution fuse F1 or F1 L1 L3 in F models Connectors X1 3...

Страница 27: ...connection wiring for circuit board 1 1400 W 4 circuits combined parallel connection wiring for circuit board 1 Note If you are using parallel connections please note that all output circuits in same...

Страница 28: ...cuit board operates according to the addressable luminaire monitoring principle When the DIP switch number 4 is in the ON position the circuit board operates according to the circuit monitoring princi...

Страница 29: ...follows 1 Set the current on the TS5 XST0201 B DIP switch according to the guidelines in the illustration below NOTE The charging current must ALWAYS be set checked based on the number of ampere hours...

Страница 30: ...s flashing Checking luminaire circuits on at a time is running As the checking process progresses the LEDs will show the luminaires found in the circuit or the total input power of the circuit Once th...

Страница 31: ...tery unit other than changing the batteries when the specified emergency mode duration is no longer achieved The luminaires need to have their light sources replaced once they have reached the end of...

Страница 32: ...ptions that can be added to a central battery unit depending on the model You can either select a central battery unit that already includes the option or select the option as an added feature dependi...

Страница 33: ...Figure 2 LCD after having received configuration data from the central battery system 8 1 3 LCD menu tree When you press the SETUP button the LCD menu tree is displayed You can browse the menu by pres...

Страница 34: ...er board first select the board using the buttons then confirm your selection by pressing the SETUP button To move back to the higher level menu from the test log press the SETUP button for 1 5 s You...

Страница 35: ...test log press the SETUP button 8 1 7 Setup You can change the settings and start tests by first selecting the desired function using the buttons and then confirming your selection by pressing the SET...

Страница 36: ...lowing display is shown Figure 11 USB cable connected The LCD software will scan the USB ports opening a connection A new row will appear on the display informing you that a connection has been opened...

Страница 37: ...TKT66xxC N D L or optional feature TST6631 It is a possible to switch the language of the printing with the DIP switches of the TST3004 unit The TST3004 contains the pre programmed languages English...

Страница 38: ...SCHARGE CURR 01 20A Current of all circuits in battery use BATT VOLTAGE 249V Voltage of battery on time of printing LUMINAIRE TEST OK 00 00 00 Result and date of last luminaire test BATTERY TEST OK 00...

Страница 39: ...cally reset when the fuse has been replaced with a new one The condition of the output circuits is checked only before the tests The circuit voltages are checked at this time with an open and closed o...

Страница 40: ...VOT1 Rev 1 5 EN 5 11 2015 TKT66 Installation and maintenance 40 TKT66 P...

Страница 41: ...VOT1 Rev 1 5 EN 5 11 2015 TKT66 Installation and maintenance 41 APPENDIX 3 Connection alternatives for batteries...

Страница 42: ...VOT1 Rev 1 5 EN 5 11 2015 TKT66 Installation and maintenance 42 APPENDIX 4 Circuit diagram with 1 phase input and BCM connection...

Страница 43: ...VOT1 Rev 1 5 EN 5 11 2015 TKT66 Installation and maintenance 43...

Страница 44: ...VOT1 Rev 1 5 EN 5 11 2015 TKT66 Installation and maintenance 44...

Страница 45: ...VOT1 Rev 1 5 EN 5 11 2015 TKT66 Installation and maintenance 45...

Страница 46: ...VOT1 Rev 1 5 EN 5 11 2015 TKT66 Installation and maintenance 46...

Страница 47: ...VOT1 Rev 1 5 EN 5 11 2015 TKT66 Installation and maintenance 47...

Страница 48: ...VOT1 Rev 1 5 EN 5 11 2015 TKT66 Installation and maintenance 48...

Страница 49: ...VOT1 Rev 1 5 EN 5 11 2015 TKT66 Installation and maintenance 49...

Страница 50: ...VOT1 Rev 1 5 EN 5 11 2015 TKT66 Installation and maintenance 50...

Страница 51: ...VOT1 Rev 1 5 EN 5 11 2015 TKT66 Installation and maintenance 51...

Страница 52: ...VOT1 Rev 1 5 EN 5 11 2015 TKT66 Installation and maintenance 52 APPENDIX 5 Circuit diagram with 3 phase input...

Страница 53: ...VOT1 Rev 1 5 EN 5 11 2015 TKT66 Installation and maintenance 53...

Страница 54: ...VOT1 Rev 1 5 EN 5 11 2015 TKT66 Installation and maintenance 54...

Страница 55: ...VOT1 Rev 1 5 EN 5 11 2015 TKT66 Installation and maintenance 55...

Страница 56: ...VOT1 Rev 1 5 EN 5 11 2015 TKT66 Installation and maintenance 56...

Страница 57: ...VOT1 Rev 1 5 EN 5 11 2015 TKT66 Installation and maintenance 57...

Страница 58: ...VOT1 Rev 1 5 EN 5 11 2015 TKT66 Installation and maintenance 58...

Страница 59: ...VOT1 Rev 1 5 EN 5 11 2015 TKT66 Installation and maintenance 59...

Страница 60: ...VOT1 Rev 1 5 EN 5 11 2015 TKT66 Installation and maintenance 60...

Страница 61: ...VOT1 Rev 1 5 EN 5 11 2015 TKT66 Installation and maintenance 61...

Страница 62: ...VOT1 Rev 1 5 EN 5 11 2015 TKT66 Installation and maintenance 62 APPENDIX 6 Central battery unit main diagram 1 phase...

Страница 63: ...VOT1 Rev 1 5 EN 5 11 2015 TKT66 Installation and maintenance 63 APPENDIX 7 Central battery unit main diagram 3 phase...

Страница 64: ...test automatically battery test manually luminaire test manually battery test automatically 6 Sensitivity 7 Luminaire test time 8 Delay time 9 Cent Number 10 Battery level 11 Duration 12 Years 13 Mon...

Отзывы: