background image

23 

 

10. 

E

RROR CODES

 

 

 

Origin 

Cause 

Action 

Er01  Auger 

or 

boiler 

safety 

thermostat 

It occurs if the hopper (85ºc) 
or 

boiler 

(95ºc) 

limit 

temperature is exceeded. 

The water is not circulating. 

Circulator  pump  blocked  with 
dirt, installation with air in the 
circuit,  or  closed  radiator 
valves. 

Check  the  installation. 
Wait  for  the  boiler  or 
hopper to cool down and 
for the message Stop or 
OFF  to  appear  on  the 
display. 

Er02  Combustion  chamber  safety 

pressure switch. 

Occurs  if  the  combustion  fan 
cannot  make  a  depression  in 
the 

combustion 

chamber 

greater than 20Pa. 

Chimney clog. 

Door  or  ash  drawer  not 
properly closed. 

Loose door cord. 

Silicone  tube  or  clogged 
pressure socket. 

Return  of  wind  through  the 
chimney 

Check 

chimney 

cleanliness 

Check  the  door  and 
seals. 

Check 

the 

pressure 

gauge  of  the  pressure 
switch. 

Er03  Smoke temperature sensor 

Extinguishing combustion due 
to  low  smoke  temperature, 
lack of fuel 

Occurs 

if 

the 

smoke 

temperature  drops  below  the 
minimum 

value 

set 

for 

extinguishing. 

Lack of fuel 

Low calorific fuel 

Too-down  correction  of  pellet 
recipe 

Refill hopper 

 

Check  fuel  quality  and 
replace. 

Er04  Boiler temperature sensor 

Exceeded 

boiler 

water 

temperature (90ºc). 

Circulator pump blocked, air in 
circuit  or  any  valve  closed  or 
blocked. 

Check  the  installation. 
Wait  for  the  boiler  or 
hopper to cool down and 
for the message stop or 
off  to  appear  on  the 
display. 

 

Er05  Smoke temperature sensor 

Extinguishing combustion due 
to 

excessive 

smoke 

temperature. 

Lack of cleaning of the smoke 
circuit. 

Lack of dissipation, obstructed 
or blocked ambient fan. 

Correction too upwards of the 
pellet recipe 

Perform 

boiler 

maintenance. 

The 

exchange  circuit  will  be 
closed. 

Check 

pellet 

recipe 

normal value 0. 

Er07  Combustion fan encoder. 

Combustion 

fan 

encoder 

error: 

Occurs if the rotation signal is 
not received by the controller. 

Check the plug and connecting 
cable on the fan and controller 

Reset  the  error  and 
restart  the  boiler,  if  the 
error  persists,  call  a 
technician. 

Содержание EBONY

Страница 1: ...TEK Biomasse 2022 NG01 K100 EN220831 EBONY SLIM Pellet stove Instruction Manual...

Страница 2: ...2...

Страница 3: ...ation 12 7 9 1 Calculation of thermal power and average hourly consumption 12 8 Use of the stove 12 8 1 Useful information 12 8 2 Lighting 12 8 3 Stop 12 8 4 Unplug the device from the mains 13 8 5 K1...

Страница 4: ...nd health and domestic animals 1 3 Packaging of documentation This manual as well as any other applicable documentation must be stored diligently so that it is available at all times In case of moving...

Страница 5: ...ctive or out of calibration On water models the installer must inform the user of the following In case of water leaks it is necessary to turn off the water supply and immediately notify technical sup...

Страница 6: ...resulting from improper use or negligence lack of maintenance installation in violation of current regulations and laws Use of poor quality pellets or any other similar product in disregard of the pr...

Страница 7: ...is the only fuel indicated for this equipment Yield and power vary depending on the quality of pellets used For correct operation you must use pellets according to the characteristics below Technical...

Страница 8: ...comply with some essential rules Improper installation will compromise the safety and proper functioning of the stove When installing the equipment all national and local regulations as well as Europe...

Страница 9: ...n chamber through an air inlet located at the back of the stove which can be channeled to the outside You must not use bends or tubes with a section smaller than 60mm nor a maximum length greater than...

Страница 10: ...erted installation male downwards to prevent condensation from flowing out of the chimney For chimneys over 5 meters high their section must change to a diameter of 100 mm after 5 meters The dimension...

Страница 11: ...out by qualified personnel according to EN 10683 Ensure that the electrical installation is earthed With the switch off connect the cable to the wall socket and plug Figure 7 Turn on the switch to el...

Страница 12: ...ned off The ash compartment must not be opened while the stove is operating Wait for it to stop and cool down completely to clean the ash Simultaneous use with other ventilation systems see point 7 2...

Страница 13: ...Panel shows Time and date chrono activation combustion heating power operating mode room temperature and required main temperature keys Occupation P1 Exit Menu Submenu P2 Ignition Extinguishing press...

Страница 14: ...maximum value of the temperature scale probe Open door You must close the door door Delay in stopping the equipment The equipment was turned off when it was on Wait for this operation to complete OFF...

Страница 15: ...displayed a automatic combustion m manual combustion and the operating power of the system Heating By entering this menu you can change the heating power You can configure it in automatic or manual mo...

Страница 16: ...s are the same for every day of the week Weekend Select between Monday to Friday and Saturday to Sunday times and set the ignition and extinguishing time Refill This menu allows you to activate the fu...

Страница 17: ...n level to automatic Keyboard Menu Shine Allows you to adjust the brightness of the panel Contrast Allows you to adjust the panel contrast My Light Allows you to adjust the minimum brightness of the p...

Страница 18: ...ty of the pellets used Figure 9 Brazier Put the brazier back in place ensuring the perfect alignment of the resistance hole with the respective resistance Incorrect alignment can cause ignition failur...

Страница 19: ...d between the central fins of the grid as shown in the picture below Open the combustion chamber door remove the brazier and vacuum the ash using an ash vacuum Remove the ash drawer and open the lower...

Страница 20: ...back panel just remove the screws Removing the alter panels implies loosening 2 screws as shown in the picture Pull the panel upwards by detaching them as shown in the image Loosen the screw as marked...

Страница 21: ...not to damage the blades 9 3 1 Chimney cleaning Chimney cleaning should be carried out at least twice a year at the beginning and middle of the winter season or when necessary This cleaning must be ca...

Страница 22: ...ucture and or scrape the paint 9 5 End of season maintenance At the end of the heating season you must have your stove completely serviced by a specialized technician This maintenance is intended to e...

Страница 23: ...ature lack of fuel Occurs if the smoke temperature drops below the minimum value set for extinguishing Lack of fuel Low calorific fuel Too down correction of pellet recipe Refill hopper Check fuel qua...

Страница 24: ...n vessel is confirmed Er11 Internal clock error Incorrect day and time due to prolonged absence of power supply The boiler has been disconnected from power for a long time and the internal battery has...

Страница 25: ...eference value not reached Possible obstruction of the chimney or air intake Open ash door or drawer Clean the chimney Check door seal and ash drawer Er42 Air flow mass sensor During the Check Phase U...

Страница 26: ...26 11 ELECTRICAL SCHEME...

Страница 27: ...27 12 DIMENSIONS AND CONNECTIONS EBONY model...

Страница 28: ...28 SLIM Model...

Страница 29: ...7 9 4 8 7 9 4 8 Air Pellet consumption kg h 1 91 0 99 1 91 0 99 Autonomy H 6 80 12 10 6 80 12 10 Performance 86 85 86 85 CO to 13 O 2 ppm 0 01 0 01 0 01 0 01 Mass flow of smoke g s 7 52 6 99 7 52 6 99...

Страница 30: ...30...

Страница 31: ...31...

Страница 32: ...and Factory 1 Factory 2 Estrada dos Guilhermes 27 Moinho de Vento 1 E 2405 012 Maceira LRA 2405 008 Maceira LRA Portugal Portugal Phone 351 244 770 240 comercial grupovm pt www tekbiomasse com Authori...

Отзывы: