background image

In order to prevent the variety of problems which caused 

by incorrect operation,Please read the manual first before 

operating this machine and pay attention to the items marked 

in “note”. 

Please 

keep 

this 

manual 

carefully 

for 

checking 

when 

needed.

 

 

 

Summar

Summar

Summar

Summary

y

y

 

 

 

 

Transportation, 

installation, 

safe 

operation 

of 

moving 

and 

operating methods and attentions; 

 

Installation and operation; 

 

Function adjustment; 

 

Maintenance; 

 

General troubleshooting and solutions; 

 

Main components diagram; 

 

Circuit connection diagram. 

 

 

 

 

 

 

 

 

Содержание Kidde Dozer

Страница 1: ...to the items marked in note Please keep this manual carefully for checking when needed Summar Summar Summar Summary y y y Transportation installation safe operation of moving and operating methods and attentions Installation and operation Function adjustment Maintenance General troubleshooting and solutions Main components diagram Circuit connection diagram ...

Страница 2: ... the game door unless maintenance or parts replacement is required 2 Please switch off the power before checking and maintenance 3 Please switch off the power before opening the game door 4 Fire extinguisher equipment must be nearby the game Installation Installation Installation Installation The game must be located properly to avoid damages Improper Locations ...

Страница 3: ...o prevent bodily injury short circuit and power leakage 3 To put the machine to normal operating please properly adjust the coin match and the game settings when use at the first time 4 Please regularly check all the functions of the game when operate to prevent dysfunction Notes of Maintenance Notes of Maintenance Notes of Maintenance Notes of Maintenance 1 Be sure to check and maintenance the ga...

Страница 4: ...ging the surface of the game please do not use the following cleanser Alterative Cleanser Acidic Cleanser Insecticide sterilized water alcohol or other chemical cleanser Notes of Moving and Shipping Notes of Moving and Shipping Notes of Moving and Shipping Notes of Moving and Shipping 1 Properly disassemble the game for necessary moving and shipping 2 Prevent the game from hitting or being attrite...

Страница 5: ...OWE 12 5 3 INPUT POWER 錯誤 錯誤 錯誤 錯誤 尚 尚 尚 尚 未 定 義 書 籤 未 定 義 書 籤 未 定 義 書 籤 未 定 義 書 籤 6 CHECK BEFORE OPERATING 14 7 DAILY OPERATING 15 7 1 INPUT POWER TO OPERATE 15 7 2 CHECK AFTER OPERATION 15 7 3 COLLECT COINS AND KEEP RECORD 15 8 GAME SETTING 16 8 1 KEYS FOR SETTING 16 8 2 SETTING METHOD 17 8 3 SETTNG DESCRIPTION 17 9 ADJUSTMENT 19 9 1 ADJUST THE COIN MECH 19 9 2 MAIN BOARD ADJUSTMENT 20 ...

Страница 6: ... 22 11 TROUBLESHOOTING 23 12 PARTS DRAWING AND PARTS LIST 24 12 1 CHASSIS COMPONENTS DIAGRAM 25 12 2 CONTROL TABLE COMPONENT DIAGRAM 26 12 3 CIRCUIT BOARD COMPONENT DIAGRAM 27 1 2 4 C H A S S I S C O M P O N E N T D I A G R A M 2 8 13 CHEMATIC DIAGRAM 29 14 AFTER SALES SERVICE DESCRIPTION 30 ...

Страница 7: ...teresting and exciting game it is specially designed and developed by our company for the young people It will be very essential and popular in amusement center Kidde Dozer is another swing machine game designed for young children to play coupled with new and popular games 主 机 板 稳 定 可 靠 稳 定 的 传 动 机 构 整 体 灯 光 设 计 完 善 靓 丽 的 外 型 设 计 高 品 质 投 币 器 高 品 质 显 示 器 ...

Страница 8: ... mechanism Simple stimulating strong operational sense and full of entertaining Operating income can be adjusted according to the situation 2 PLAYING TIPS Ride on the kidde dozer press the start button to start the game After that the kidde dozer will move up and down forward and backward turn around the steering wheel to control the direction of the kidde dozer press start button to move the truc...

Страница 9: ...1 8A 3 6A Note please refer to the nameplate located on the back of the games to check actual usage of voltage MAX POWER 400W STANDBY POWER 234W COIN SIZE φ21mm φ31mm diameter 1 2mm 2 5mm thickness CAPACITY OF COIN BOX 2600pcs of coins with coin 方向盘 操作杆 启动按钮 投币入口 ...

Страница 10: ...sizeφ25mm 1 5mm LOCATION REQUIRED 5 40 humidity is less than 90 No contact with any corrosive liquid no any greasiness and dirt DIMENSIONS L1800mm W1130mm H1450mm 1450 1130 1800 ...

Страница 11: ...ith the game 3 MOVEMENT MOVEMENT 序号 图样 名称 规格 型号 数量 1 螺口LED灯 12V 4珠 红 蓝 各2个 2 螺口LED灯 12V 7珠 七彩 5个 3 LED指示灯 绿 1个 4 波子按钮 2个 5 长片小微动开关 2个 6 锁匙 1285 2把 7 锁匙 1396 2把 8 电源线 1条 9 说明书 本书 1本 OPERATION MANUAL 拉车 拉车扣 移动扣延伸臂 出力方向 ...

Страница 12: ...game Prevent hitting rubbing the games when move the games otherwise it will damage the appearance of the game 5 5 5 5 INSTALLATION INSTALLATION INSTALLATION INSTALLATION Please follow the direction below to install the game 5 1 CHOOSE THE LOCATION FOR INSTALLATION 1 Put the Kidde Dozer in the same type of Kiddie Ride with monitor then select the concrete placement machine according to the machine...

Страница 13: ...NECTING THE POWER 1 Please check whether the parts of cabinet are loose caused by moving and the wire terminal should not drop out from the port 2 Check whether the GND is connected 3 Please check whether the resistance of power input at the both ends for GND is more than 100 megohm 4 Connect the wires 2130 2800 ...

Страница 14: ...y the other insert the mains plug to the box Attention A A A A Please make sure the power cord is not pressed by wheel foundation etc Otherwise it will damage the wire to cause short circuit even fire Do not use strong power to extend and wring the wires Do not make the wire be near to the high temperature object Properly put the wire to avoid any kicking or treading AA AA 电源线插头 市电插盒 ...

Страница 15: ...efore input the power check if the connection mode of the power suuply is correct can only input the power supply to the machine when it is in normal 5 3 INPUT THE POWER 1 Make sure the input voltage is same as the one stated on name plate on the back door of the game 2 After connecting the power please switch on the game 3 Inserting coin to check if the coin machine cans work properly ...

Страница 16: ...ion and the machine movement is normal 7 Check the sound if it is ok 6 CHECK BEFORE OPERATION Check the game before operation to prevent the game from working improperly when operated Checking item 1 Check if the cord is securely plugged in and without defects 2 Check the location of game 3 Check if the game case is without defects or burrs 4 Check if the game without dirt and properly stuck on wi...

Страница 17: ...g Before operation please confirm all the items above are ok 7 2 CHECK AFTER OPERATION 1 Check the display of the game and confirm it is proper 2 Double check the coin mech operation of the direction and the machine movement is normal If it has any problems please solve the problem as soon as possible 7 3 COLLECT COINS AND KEEP RECORD 1 Switch off the power and open the door of the coin box to tak...

Страница 18: ...coins quantity 8 GAME SETTING 8 1 KEYS FOR SETTING 设置板 设置板 选择 更改 免费 设置 ERASE ENTER SELECT SERVE TEST SW1 钱箱 设置门 ...

Страница 19: ...the game setting menu press the SELECT to choose the setting item press ENTER to change the setting 8 3 SETTING DESCRIPTION 1 Language setting interface EE3 MIDDLE OK EE2 RIGHT FF EE1 LEFT FF WAIT SOUND SELECT ON SETUP 1 1 COIN S 1 CREDIT S MODULATE VOLUME 200 LANGUAGE SELECT ENGLISH GAME TIME 150 SECONDS PRIZE TYPE TICKETS COMEORT TICKET S 0 ELECTRIC EYE CHACK AT THE MOST TICKET S 5 5 SCORES FOR ...

Страница 20: ...reen shows Chinese Game time This setting decides the length of game time If it sets 60 then it has only 60 seconds per play Demonstrate sound choice This setting decides if there is a sound output when the machine is under a state of the game demo Bonus type This setting decides if the game output the ticket Consolation prize vote This setting decides under under a state of the game without scori...

Страница 21: ...f way of the game If it sets 5 points can get a ticket then the game get 5 points can get one ticket 2 Display screen testing interface Display screen testing This picture is for testing that if the monitor display status is normal When there is no white color shows display can be failure ...

Страница 22: ...meter which prevent blocking the coin mech as inserting the large coin in by mistake 3 Turn the COIN Switch to NO COIN Signal wire and GND should be disconnected at usual time Turning switch can 代币入口调节片 退币杆 COIN信号波长调整开关 COIN信号常态开关 电源 信号输入端 代币公差微调电阻 样币槽 DC 12V STRICT SLACK Sensitivity C O I N Re mo ve R E P L A C E B ac kw a rd SW3 100ms SLOW 25ms FAST NOM 正常 MGN 精准 50ms MEDIUM WHITE COUNTER GROUND...

Страница 23: ...he micro adjusting resistance of token tolerance Clockwise increasing the sensitivity of token tolerance that is the range of accepting the token tolerance will be larger Counter clockwise decrease the sensitivity that is the range will be smaller and choose the token more strictly 9 2 MAIN BOARD ADJUSTMENT Diagram of main board 主机板 ...

Страница 24: ...ust the volume level of the machine Turning clockwise will increase the volume counterclockwise will decrease the volume warning The battery can save the data of game settings and coin number when the power off Please replace the battery when the machine can not save the game setting Volume Adjustment 2 DESCRIPTION 1 Open the back door of the chassis find the volume of the amplifier board potentio...

Страница 25: ...ans Please power off the game when check and maintain Please do not put any tools into cabinet otherwise it will cause problem After checking please tightly screw the screws and close the door 10 1 Daily Check ITEM DESCRIPTION Coin mech Check whether the coin mech can work proper Balanced approach switch Check whether the balance approach switch switch properly or not Light Check whether the machi...

Страница 26: ...volume are ok Motor Check the swing motor is normal operation Temperatur e humidity Check if the temperature and humidity is proper 10 2 Daily Maintenance ITEM DESCRIPTION Chassis Frames Clean the chassis with water and soft paper PCB Sweep the dust and dirty in the board with small brush ...

Страница 27: ...kthesensor is broken changethetestingsensors thecircuit of directionencoder is blocked checkandconnect thecircuit of direction encoder theencoder is bad replacetheencoder themonitor power lineis loose reconnect themonitor power line themonitor signal cableis not connected connect themonitor signal cable themainboardis bad maintainor replacethemainboard themointor is bad replacethemonitor thewireof...

Страница 28: ...12 DIAGRAM FOR MAIN PARTS AND PARTS LIST 12 1 CABINET 49 48 01 02 05 06 07 10 08 09 11 12 13 14 15 16 17 18 19 20 21 22 23 27 26 25 24 28 29 31 30 32 34 36 35 37 40 39 38 42 43 44 45 46 47 03 04 33 41 ...

Страница 29: ...part 1 22 Tire blister 16 23 LED 2 1m 24 Triangle chimney 3 left 1 25 Triangle board 3 left 1 NO NAME MODEL NO QTY 26 three colour light board 4 27 The rear blister 4 28 LED light bar 2 29 Hexagon blister left 8 30 three colour light board 2 31 The front blister 4 32 Triangle chimney 2 left 1 33 Light board blister4 left 1 34 Light board blister5 left 1 35 Light board blister3 left 1 36 Light boar...

Страница 30: ...t diagram and parts list 49 Transformer 220v 18v 1 1 0 1 1 0 9 0 8 0 7 0 6 0 5 0 4 0 3 0 2 0 1 方型绿色带灯按钮 04 NO 名 称 件数 2 05 06 1 1 1 08 07 摇杆 波子机按钮 小方向盘 轴承 6305 编码器 EC16 1 01 控台有机片 控台件 1 1 02 03 小长片微动开关 2 无片微动开关 方向盘座 10 11 1 1 09 1 ...

Страница 31: ...12 3 EXPLODED VIEW FOR CHASSIS 12 4 Chassis components decomposition diagram and parts list 11 12 14 13 10 09 08 06 07 05 04 03 02 15 01 01 04 02 03 12 11 10 09 08 07 06 05 ...

Страница 32: ...15 14 2 1 13 1 从动齿轮件A 件数 名 称 NO 摆臂B 从动齿轮件B 1 底架 接近开关 轴承 6305 主动齿轮件A 链条 4分 固定转轮 09 10 2 摆臂A 04 NO 名 称 件数 1 05 06 1 1 2 08 07 主动齿轮件B 电机 连接架 1 01 2 2 02 03 6 1 12 11 轴承座 地脚 2 ...

Страница 33: ...G1 Y1 G Bla1 Grey W1 Pu W1 Br W1 W Bla1 灯2 灯1 走灯5 Bla2 4 R Bla4 Bla2 3 R Bla3 L 4 4 GND R GND 2 3 3 2 1 1 OUT1 1 A CON3 2 B 平衡停电眼1 更改按键 293961 投币开关 5 3 4 6 12 7 10 9 8 11 13 16 15 14 N O P M K H I J G L F D C E 信号接口板 设置按键 方向盘位2 选择键 免费按钮 方向盘位1 平衡停电眼2 18 17 Q R 彩票反馈 19 21 20 T U S 投币码表 E1 B1 C1 D1 A1 F1 G1 J1 I1 H1 24 22 23 30 25 28 27 26 29 36 31 34 33 32 35 Z Y W V X 灯2 走灯3 震动器 灯1 走灯4 走灯5 彩票驱动 走灯2...

Страница 34: ... formulated the following way Online services FAQ Set email problem solving technical personnel real time answers to users of common questions Telephone services Guide the way to solve customer s problems by telephone On site service Users in the process of using our company s products if met the problem can t be solved through the way above the users should consultation with customer service depa...

Страница 35: ...to the maintenance application form and provide the necessary spare parts purchase order on the project content In addition the parts take time to repair so the supply time could extend please understanding 申请人 固定电话 移动电话 传真 故障描述 请详细描述 备注 维修申请单 公司名称 产品购买时间 年月日 公司地址 机器名称 机器编号 重要 ...

Страница 36: ...parts supply for 5 years Contact WWW MECPOWER COM CN ADD Wenbian Industrial Zone Wenbian Village Shiji Town Panyu District Guanghzou China TEL 020 84859302 SEVICE TEL 020 34882820 电话 零件名称 型号 机器名称 数量 备注 1 2 3 4 5 备注 传真 公司地址 零部件订购单 客户 公司名称 运输支付方式 到付 预付 ...

Страница 37: ......

Отзывы: