RISKS RELATED TO THE INSTALLATION OF THE SHELF

Entirely made in stainless 
steel AISI 304 (EN: 
1.4301). 
Suitable for cold storage 
and food, 
pharmaceutical and 
chemical sectors. 

""

"

STAINLESS STEEL BOLT SHELVING SYSTEM 

installation, use and maintenance instructions

BEFORE  MOUNTING 

the  structure  check  the  floors  and  floor  slabs,  they  must  be  in  good  condition,  without  holes  and 

accentuated unevenness and must have an appropriate consistency for the capacity of the uprights. In the case of shelf to 
be built on a mezzanine floor it is essential to consult a specialist in order to assess the resistance and the capacity of the 
floor. 

"

UNLOADING  AND  STORAGE  OF  MATERIALS. 

This  must  be  carried  out  at  a  predefined  location,  away  from  the  risks 

arising from any everyday work and contemporary installation of other systems (electricity, water, air conditioning, etc.). 
The staff must be informed about the interim storage program, the approach of the material to the area of installation and 
realization of the system itself.

 

"

ASSEMBLY AND INSTALLATION OF SHELF. 

The staff assigned to this work shall be provided with 

protective gloves

The personnel managers must coordinate all phases of movement and installation and ensure that all applicable standards 
regarding the health and safety of workers are applied.

 

BEFORE BEGINNING THE MOUNTING READ CAREFULLY 

THE CHAPTER "USE AND MAINTENANCE STANDARDS"