TECHNICAL AND MAINTENANCE MANUAL
Graph VENTILATOR
Review : 04
Date: 09/05/06
40
How to Open and Close the
Neumovent Graph
Ventilator
Operation
Description
10
Disconnect the following cables:
- Con.6, battery cable of the Ancillary Board.
- Con.12, speaker cable of the CPU Board.
- Con.5, fan cable of the Ancillary Board.
- Con. 8, RS-232 cable of the CPU Board.
Battery Cables
Speaker Cables
Fan
1
Battery
Fan Cable
Speaker
RS-232 Cable
Содержание NEUMOVENT
Страница 1: ...Graph ventilator Technical manual review 04 MAY 2006 ...
Страница 3: ...CHAPTER I GENERAL AND OPERATION FEATURES ...
Страница 12: ...TECHNICAL AND MAINTENANCE MANUAL Graph VENTILATOR Review 04 Date 09 05 06 9 ...
Страница 13: ...TECHNICAL AND MAINTENANCE MANUAL Graph VENTILATOR Review 04 Date 09 05 06 10 ...
Страница 30: ...CHAPTER II MAINTENANCE INSTRUCTIONS ...
Страница 32: ...CHAPTER III TROUBLE SHOOTING ...
Страница 37: ...CHAPTER IV SENSOR VERIFICATION ...
Страница 44: ...CHAPTER V EQUIPMENT OPENING AND CLOSURE ...
Страница 60: ...CHAPTER VI DETAIL OF ASSEMBLIES ...
Страница 70: ...CHAPTER VII ELECTRONIC BOARDS DETAIL ...
Страница 78: ...CHAPTER VIII CALIBRATION ...
Страница 90: ...CHAPTER IX FINAL CONTROL ...