![Technoton DUT-E S7 Скачать руководство пользователя страница 20](http://html.mh-extra.com/html/technoton/dut-e-s7/dut-e-s7_operation-manual_1070695020.webp)
DUT-E S7 installation / Exterior inspection prior to works start
DUT-E S7 fuel level sensor. Operation manual. Version 4.0
©
Technoton, 2021
20
2 DUT-E S7 installation
For
correct operation its mounting and configuration should be carried out by
certified specialists who have passed
ATTENTION:
Strictly follow safety rules of automobile repair works as well as local
safety rules of the customer company when mounting sensor.
2.1 Exterior inspection prior to works start
It is necessary to conduct DUT-E S7 exterior inspection for the presence of the possible defects
arisen during transportation, storage or careless use.
Contact the product supplier if there any defects.