![Technogym BIOSTRENGTH LINE Скачать руководство пользователя страница 582](http://html1.mh-extra.com/html/technogym/biostrength-line/biostrength-line_service-maintenance-manual_1070169582.webp)
BIOSTRENGTH LINE: Service & Maintenance manual - rev. 2.1
Page 8.8
8.2.3. L
EG
E
XTENSION
Figure 8.2.3-1
With the primary and secondary shaft chain and
weight stack cable disconnected:
1. With the limit switch at the end of its stroke
and the lever in position 1, adjust the position
of the PRIMARY SHAFT so that it respects
the measurements shown in the drawing.
2. To do so, adjust the position of the limit
switch by regulating the screw and nut with a
17-gauge wrench.
Figure 8.2.3-2
3. The cam and pinion of the secondary shaft
must be connected so that the punch
∅
2 on a
tooth of the pinion is aligned with the hole in
the cam.
Continued on next page
→
Содержание BIOSTRENGTH LINE
Страница 1: ...SERVICE MAINTENANCE MANUAL REV 2 1...
Страница 2: ......
Страница 4: ......
Страница 16: ...BIOSTRENGTH LINE Service Maintenance manual rev 2 1 Page xii Page intentionally left blank...
Страница 88: ...BIOSTRENGTH LINE Service Maintenance manual rev 2 1 Page 2 70 Page intentionally left blank...
Страница 99: ...BIOSTRENGTH LINE Service Maintenance manual rev 2 1 Page 3 11 Figure 3 2 5...
Страница 121: ...BIOSTRENGTH LINE Service Maintenance manual rev 2 1 Page 4 1 4 ACCESSORIES The equipment has no accessories...
Страница 122: ...BIOSTRENGTH LINE Service Maintenance manual rev 2 1 Page 4 2 Page intentionally left blank...
Страница 634: ...BIOSTRENGTH LINE Service Maintenance manual rev 2 1 Page 9 26 Page intentionally left blank...
Страница 645: ......