BIOSTRENGTH LINE: Service & Maintenance manual - rev. 2.1
Page 7.287
7.7.30. D
ISASSEMBLING THE PULLEYS
Figure 7.7.30-1
Follow the steps described in paragraph 7.7.17.
“Disassembling the upright guard”.
For type
A
pulleys:
1. Unscrew the screw
a
and the nut using 2 17-
gauge wrenches.
2. Remove the pulley.
For type
B
pulleys:
3. Unscrew the screw
b
using an 8-gauge
hexagonal T-wrench.
4. Remove the washer and cable lock.
5. Remove the pulley.
To reassemble the PULLEYS, follow the above
steps in reverse order.
Содержание BIOSTRENGTH LINE
Страница 1: ...SERVICE MAINTENANCE MANUAL REV 2 1...
Страница 2: ......
Страница 4: ......
Страница 16: ...BIOSTRENGTH LINE Service Maintenance manual rev 2 1 Page xii Page intentionally left blank...
Страница 88: ...BIOSTRENGTH LINE Service Maintenance manual rev 2 1 Page 2 70 Page intentionally left blank...
Страница 99: ...BIOSTRENGTH LINE Service Maintenance manual rev 2 1 Page 3 11 Figure 3 2 5...
Страница 121: ...BIOSTRENGTH LINE Service Maintenance manual rev 2 1 Page 4 1 4 ACCESSORIES The equipment has no accessories...
Страница 122: ...BIOSTRENGTH LINE Service Maintenance manual rev 2 1 Page 4 2 Page intentionally left blank...
Страница 634: ...BIOSTRENGTH LINE Service Maintenance manual rev 2 1 Page 9 26 Page intentionally left blank...
Страница 645: ......