12
Join the two halves of the level by means of the 4 screws DIN933, variable metric according
to model (18), and their corresponding washers and nuts, and fix the level to the upper
connection of the installation.
Slightly loosen the clamp (11) that fixes the upper support (12), remove the adhesive tape
from the upper glass tube (14) and lower it until it rests on the seal (16). Gently press the
tube longitudinally against the seal and tighten the 3 screws (4) and their nuts (2).
NOTE: The clamps (1, 10) that fix the guide-supports (3,13) should never be loosened.
IMPORTANT NOTE: The joint group of the 2 sections of glass tube does not fix its
longitudinal displacement, but ensures the correct sealing of the joint.
DETAIL C
Содержание LT106
Страница 1: ...R MI LT Rev 3 english version Instructions manual The art of measuring Series LT Level gauge...
Страница 41: ...41 LT LTL15 PTFE All dimensions in mm LT LTL14 PP PVC PVC C PVDF According to DN According to DN...
Страница 42: ...42 All dimensions in mm LTL APR LT APR LT AMM AMD LTL AMM AMD...
Страница 43: ...43 LT AAR All dimensions in mm LT xxx ADF LTL xxx ADF...
Страница 44: ...44 22 ATEX CERTIFICATE...
Страница 45: ...45...
Страница 46: ...46 23 ATEX DECLARATION OF CONFORMITY...
Страница 47: ...47...