
CENTERING DEVICE, RBK-X1
Rev. 1
Jan. 2021
.
Page 12
2.6 Install F.R.L & line pipe
1. Assemble the F.R.L onto the rear side of machine left cover, by the 2X M5 screw
2. Connect the 2X output pipe with Detection Unit & Centering Unit. Fix the pipe in suitable position by
tie-
wraps. Rotate Disc for cycles, double check the pipe won’t affect the movement of machine.
2x M5 screw
& M5 nut
Panel connector