TE connectivity Confidential
This communication includes TE connectivity confidential or
proprietary information that may also be legally privileged.
28 Apr ‘11 Rev.C
411-78289
Instruction Sheet
Lever Actuated Land Grid Array
LGA1366 / LGA1356 Socket
17 of 31
Grasp the package with your thumb and forefinger at median of its edges. (Fig.38)
Place the package onto the contact grid of socket horizontally. (Fig.39, 40)
Please ensure the package is not sitting on the housing of socket. Please see following
slide for prohibitions.
After installation, please confirm if the package is installed correctly. (Fig.41)
Check 4 corners - the housing walls guide the package
Check orientation keys are aligned with the package cut outs
Fig.38 Grasp
package
Fig.39 Verify
orientation
Pin1 indicator
Fig.40 Horizontal
instillation
Fig.41 Confirm package
installed correctly
5. Package installation procedure
5.3 Package installation – How to hold the package