412-10100
Rev A
16
of 74
3 Receiving, inspection, and installation
3.1
Receiving and inspecting
The CQM II is thoroughly inspected during and after assembly. A final series of inspections is made before
packaging and shipping to insure the proper functioning of the CQM II. However, damage can occur during
shipment. When you receive the CQM II, complete the following steps:
1. Remove the outer bands from the box.
2. Carefully remove the CQM II from the box.
3. Inspect the CQM II for damage.
4. If damage is evident, file a claim against the carrier and notify TE immediately.
NOTE
Save the shipping carton and the entire documentation package shipped with the CQM II.
3.2
Installation
1. Install the power supply.
2. Plug the cord into the module.
3. Plug the AC plug into an appropriate supply.
4. Turn the power on.
The power indicator light on the front of the CQM II host module and CQM DAQ module illuminates. During the
system boot process, several TE images are displayed. After approximately 30 seconds, the system is ready to
accept a Work Order or displays a user login screen (depending on the user settings).
If the power indicator light is not illuminated or nothing is displayed, turn the power off and notify TE
immediately.
NOTE
The installation instructions for the Crimp Quality Monitor II are included with the appropriate machine interface kit. For
example, if the CQM II is being installed on a bench version of the AMP
–
O
–
LECTRIC Model G Terminating Machine, the
CQM/GTM Kit is required. The documentation package included with the kit contains the installation instructions for the
system installation.