2.2.
Emergency Machine Off (EMO) / ESTOP
The Emergency Machine Off / Emergency Stop switches are mounted on the front and back of the press. They
are clearly marked. When pressed, the switch latches in the pressed state and must be twisted to release. The
EMO circuit is a hardware-based (dry contact) latching circuit that does not reset when the EMO switch is
released.
All voltage that is above 24VDC and external to the control cabinet (with the exception of the computer monitor)
is removed when the EMO is pressed.
3.
INSTALLATION
This section describes the installation steps and requirements.
3.1.
Shipping
The press should be shipped on a pallet, shrink-wrapped and crated for protection. The computer, monitor
assembly, leveling feet, and other miscellaneous loose parts should be removed, labeled properly and shipped
with the machine.
3.2.
Uncrating
Remove the shrink-wrap and unpack the monitor assembly, computer and other shipped parts. Remove Press
from pallet by lifting Press up from front side with Forklift until threaded feet studs clear the supports on the
pallet. Screw on the support foot pads to the Press, if not already. See Figure 4.
Figure 4
3.3.
Initial Assembly
1. Remove X and Y Axis shipping straps.
2. Level procedure: Verify that the Press is sitting flat on all six supports. Use a Bubble gage, set in both
the X and Y Axis position and located on the Horizontal center plate (bottom tool fixture support).
Adjust the feet, as appropriately, to level bubble gage in both X and Y Axis.
3. Install customer supplied 4-conductor power cord (230VAC 1Ø 25 Amp) thru bottom pass-thru in the
rear chassis and into Master Disconnect Switch in the rear electrical enclosure.
4. Install customer supplied industrial airline to the Air Regulator located inside rear chassis. Verify that
shop air input has approximately 80 P.S.I. (.55 MPa) (5.5 bar) to the CAP Air Regulator.
5. Install Monitor assembly on left front side. Connect VGA, USB and power cable to monitor. Install
keyboard and trackball to the monitor stand.
6. Install computer in left front enclosure. Connect VGA, USB and power cables. Connect keyboard and
trackball to computer. Plug computer into internal power strip located inside front enclosure on the left
side.
7. Connect USB to CAN interface to USB port of computer.
8. Install Light Beacon/tower to top cover on left side.
9. Power up Press by turning on Master Power Swit
ch. Verify that computer comes “up”
. If proper
supervisor data (specific customer assignments) is installed in computer database, Press should be
fully operational.