7
TDS
Technical dive system ■ 6
www.cascoantiguo.com |
www.tdsdive.com
1
ST
Stage -
2
ND
Stage
- Octopus
Instructions
- User’s manual ■ 7
3.
PREPARATION AND CONFIGURATION
TDS recommends that you take your regulator to a TDS Licensed Technician for the
installation of any ancillary elements, including instrumentation, LP quick discon-
nect hoses, and alternative air sources.
CAUTION:
when the user assembles or disassembles the SCUBA device, that could cause
damage to the product and subsequently cause injury to the diver.
3.1
ASSEMBLY OF THE FIRST STAGE IN THE BOTTLE VALVE
3.1.1
INT TYPE CONECTOR
1.-
Partially loosen the first-stage regulator yoke screw so that the filter dust cap
and air inlet can be removed.
2.-
Remove the protective cover of the bottle valve.
3.-
With the bottle valve outwards, release a small amount of air from the bottle by
turning the steering wheel counterclockwise to open the valve only slightly. When
you hear air coming out, immediately close the valve. This will remove any moisture
or dirt that may be inside the outlet opening of the bottle valve.
4.-
Check the condition of the O-ring of the bottle valve.
1
ST
STAGE
DIAPHRAGM
MAXIMA PRESSURE WORK
INT: 3300 PSI / 232 Bar
DIN: 4350 PSI / 300 Bar
AVERAGE PRESSURE
140 +/- 5 PSI (9.65 +/- .35 BAR)
NUMBER AND SIZE OF PORTS
2 HP 7/16", 5 MP 3/8"
ANSTI TESTED DEPTH
80 METERS
CERTIFIED DEPTH
50 METERS
GAS COMPOSITION
AIR (OCEANUS, PROTEUS, TAC BLACK)
GAS COMPOSITION
NITROX (GULL BLACK)
HP PORTS
1 (OCEANUS) 2 ( PROTEUS, GULL, TAC BLACK)
LP PORTS
3 (OCEANUS) 4 (PROTEUS, TAC BLACK) 5 (GULL)