Ludwig-Rinn-Straße 10-14 • D- 35452 Heuchelheim/Gießen • Phone: +49 6 41-9 62 84-0 • Fax: +49 6 41-9 62 84-28 • www.tci.de
Seite 17 von 32
3.3 Assembly
For mounting the device please follow the instructions below:
The device should only be mounted by authorized staff. Furthermore it must be
disconnected from mains so that it is de-energized.
1. After unpacking first put the unit with its surface on one of the inner parts of the
packaging. So you may protect the chassis from damage!
2. There are two mounting possibilities: mounting arm installation (without internal cabling)
via Vesa75 or panel mounting, for which you should use M4 drilling and the union nut of
the LAN connection.
For both mounting possibilities please make sure that the housing is not damaged by
using screws that are too long because this destroys the IP protection.
Moreover you need to use the appropriate IP screw connection for the LAN port.
!
1 Kabel-Lösung: Stromversorgung über LAN-Kabel - LAN mit PoE oder LAN mit 24 VDC
1 cable solution: power input over LAN with PoE or LAN with 24 VDC