6.2.3.   Rotary filters 

The rotary filters installed in the TCF Air Treatment Units 
come  complete  with  control  board  and  differential 
pressure switch. 
The  MAINTENANCE  OPERATIONS  to  be  performed 
periodically are as follows: 
- cleaning and lubrication of the gears: every 6 months 
- drive chain tension check: every week 
-  replacement  of  fouled  filtration  diaphragm:  if  the 
equipment spare has been consumed. 

To replace the diaphragm, proceed as follows (fig. 35): 
- stop the system by turning off the control board master 
switch: 
-  after  retrieving  the  check  pin  (1  ).  extract  the  empty 
clean filter roller (2) and replace the filtration diaphragm 
(3) 
-  refit  the  full  clean  filter  roller  (2),  check  the  correct 
direction  of  air  flow  and  make  sure  that  the  pin  (1)  has 
been reintroduced on the reduction gear motor side 
-  roll  out  the  clean  filtration  diaphragm  until  the  end  of 
the dirty diaphragm hooks onto it 
- using the manual control, rewind the whole of the dirty 
filter onto the relevant roller (4) 
- after retrieving the check pin (5), extract the dirty filter 
miler (4) and remove the diaphragm 
- after replacing and blocking the empty dirty filter roller 
(4), fasten the clean diaphragm (3) to it using the spring 
- make sure that the system functions correctly using the 
manual  control.  If  it  does  not,  check  the  operations 
performed 
- lastly. set the control panel switch to automatic. 

6.2.4.   Reconditionable bag filters 

These are non-rigid filters with EU3-EU4 efficiency THEY 
CAN BE RECONDITIONED using two different methods. 
-  With  a  vacuum  cleaner,  after  removing  the  filter  from 
the Unit on the air inlet side.  
-  If  this  method  is  used  the  filter  can  be  reconditioned 
from 7 to 1 O times, after which the filter's efficiency and 
accumulation capacity is impaired 
If this method is not sufficient to remove impurities from 
the filters, proceed as follows: 
-  extract  the  filters  from  the  unit  and,  holding  them  with 
the  aperture  uppermost,  rinse  them  with  a  weak  jet  of 
warm water (50°C max), letting the impurities run out at 
the bottom through the filtration diaphragm 
-  let  the  filters  dry  thoroughly  by  evaporation  before 
refitting them. Do not use air jets to dry them. 
In  this  way  the  filters  can  be  cleaned  2-3  times,  after 
which the filter's characteristics will be compromised and 
it will have to be replaced. 

6.2.5.   Non-reconditionable 

medium-high 

efficiency 

filtration sections 

This category includes BAG FILTERS with efficiency equal 
to or in excess of EU5, and ABSOLUTE FILTERS. 
They  are  characterised  by  an  initial,  clean  filter  loss  and 
by  a  final  loss  beyond  which  the  filter  loses  its 
accumulation capacity and original efficiency and must be 
replaced.  The  filter  must  be  replaced  when  it  reaches  a 
loss  level  between  the  two  points  specified  above.  This 
loss  is  fixed  at  the  design  stage  on  the  basis  of  the 
following considerations: 
-  it  must  not  be  high  so  as  to  prevent  imbalances  in  the 
system 
- it must not be low  to give  the filters a sufficient service 
life 
THE  REPLACEMENT  LOSS  CAN  BE  MEASURED  WITH  A 
DIFFERENTIAL  PRESSURE  SWITCH.  The  recommended 
values are shown in table 8. 

6.2.5.1.  Non-reconditionable bag—filters 

These  are  filters  with  an  efficiency  of  between  EU5  and 
EU9.  THEY  CANNOT  BE  RECONDITIONED  as  this  would 
damage their accumulation capacity and efficiency. 
In  order  to  preserve  the  filtration  diaphragm  for  as  long 
as  possible,  the  condition  of  the  pre-filters  must  be 
monitored  carefully.  Moreover,  TCF  recommends  you 
check  the  state  of  the  gaskets  on  the  frames  and  the 
springs every week to prevent air passing the bag without 
being filtered. 

6.2.5.2.  Absolute filters 

These have an efficiency of between EU1O and EU14. 
In order not to harm the very fine filtration capacity that 
the  filter  in  question  is  required  to  ensure,  you  must 
check,  on  at  least  a  weekly  basis,  the  condition  of  the 
gasket  between  filter  and  frame  as  well  as  the  rigidity  of 
the 

assembly. 

ABSOLUTE 

FILTERS 

CANNOT 

BE 

RECONDITIONED  and  must  be  replaced  when  the  preset 
loss has been reached. 

Содержание ZAE Series

Страница 1: ...1 INSTALLATION OPERATION AND MAINTENANCE MANUAL AIR HANDLING UNITS ZAE SERIES ...

Страница 2: ...ging duct section between Unit delivery inlet and obstruction 18 5 3 2 Elbows 19 5 3 3 Control air locks 19 6 MAINTENANCE 20 6 1 FOREWORD 20 6 2 FILTRATION SECTIONS 20 6 2 1 Reconditionable synthetic filters 20 6 2 2 Metal filters 20 6 2 3 Rotary filters 21 6 2 4 Reconditionable bag filters 21 6 2 5 Non reconditionable medium high efficiency filtration sections 21 6 2 5 1 Non reconditionable bag f...

Страница 3: ... ryto commissioning The recommendations that follow are intended to ensure continuous operation of the Air Treatment Unit and long machine life The procedures described below should be followed by skilled personnel with a good working knowledge of air conditioning systems engineering and air treatment units even though the unit can be operated by those unfamiliar with air treatment thanks to the m...

Страница 4: ...g product compliance with prevailing European Union machine directives 2 2 PACKING The Air Treatment Units are usually supplied as fully assembled monoblocks Only if the customer expressly requests it can the units be broken down into several sections to facilitate transportation and carriage through narrow apertures stairs or corridors Transportation of the machines both monoblock and broken down...

Страница 5: ...steps must be taken first Prior to installation position the Unit and the accessories in a place affording the best possible protection against accidental knocks dust and atmospheric agents Carefully cover the inlets and outlets to prevent foreign matter from entering the unit and damaging the internal components Extract the pre filters from the Unit and put them in a protected place to preserve t...

Страница 6: ...nctioning of the condensate drains difficulty in opening and closing the inspection doors The horizontal alignment of the support surface must be checked with a SPIRIT LEVEL adjustments may be made using STEEL SHIMS 3 3 3 Vibration damping In order to ensure effective protection against vibrations the Air Treatment Unit must be installed as follows suitable DAMPERS in material designed to withstan...

Страница 7: ... assembled parts are perfectly aligned and level fig 8 Fasten the sections together with screws in the holes provided The holes are located on the inside of the corners and in the case of dimensions greater than 1 3 m also in a midway position The screw fastening areas can usually be accessed from the inspection doors Otherwise you must remove the panels next to the area involved Should the Unit b...

Страница 8: ...pport the connecting pipes The weight of the pipes must under no circumstances bear down on the manifold 4 2 1 Water exchange In order to ensure an optimum heat exchange you must WASH the heat exchanger before connecting it to the water mains once installed in a workmanlike fashion any air present in the hydraulic circuit must be expelled using the relevant valve To allow easy extraction of the ex...

Страница 9: ...ons to prevent the likelihood of rupture at the joint between manifolds and copper pipes In order to ensure correct operation of the thermal expansion valve the bulb of the valve must be in perfect contact with the intake line and fitted on the outside of the air flow so as not to be affected by it Special care must be taken with the SIPHONING of these exchangers to ensure the maximum heat exchang...

Страница 10: ...be taken to ensure that the base is level see section 3 3 2 The steam system must be complete with all the necessary regulating filtration and safety devices which must be correctly sized Each heat exchanger must be fitted with a condensate drain which must be oversized to allow drainage of the greater quantity of condensate that is formed during system start up Provision must also be made for the...

Страница 11: ...arise in which there is no water in the tank the pump motor would overheat and be irreparably damaged Conversely if there is too much water in the tank an overflow may result leading to flooding of the unit and the installation room 4 3 5 Ultrasonic steam submerged electrodes compressed air humidification For Air Treatment Units with the above listed types of humidification you should consult the ...

Страница 12: ...tion of the prefilters located in the relevant counter frames with safety springs or guides The electrical connection and installation instructions for the rotary filtration section are provided in the specific manual provided The instructions for introduction of the reconditionable filtration diaphragm are set out in the maintenance chapter 6 2 3 After removing the filters from the packing in whi...

Страница 13: ... motor start up system is obtained by connecting the motor direct to the power supply However this method has limitations due to the high start up current pick UD this type of start up is recommended for power ratings of up to 5 5 KW at which TCF installs 4 pole 220 380 V three phase motors as standard The wiring diagrams are shown in fig 27 4 6 1 2 Connecting with delta star starter If the motor ...

Страница 14: ...f the same size but with separate windings 4 6 1 4 Permitted start time With regard to the temperature increase the start up time of a motor may not exceed the value shown in table 1 In the case of repeated starts with unchanging rated power the temperature of the motor must be the same as it was before the first start Therefore in order for the values in the table to be valid it is assumed that t...

Страница 15: ...cularly important both during the design and installation phases The sound pressure values of our machines are indicated In our technical catalogues or can be supplied directly by our Technical Department according to the requested air moving characteristics Being therefore aware of the sound emissions produced by the Unit the Designer must make sure that in treated environments maximum values lai...

Страница 16: ... check that the motor protection devices are sized for the maximum amperage corresponding to the rated value lf the protection devices are sized for an amperage in excess of the rated value you must make sure that the working range is sufficient 5 2 2 Flowrate check Using an oil or water column pressure gauge or an analogue and or digital gauge check the FLOW RESISTANCE in the various filtration s...

Страница 17: ...er operating conditions should be made on the remote control power switches inside the control board using an amperometer clamp Under no circumstances must the measurements be made directly on the motor terminals since this is possible only with the inspection door open a condition that would alter the length of the air circuit and therefore the working point of the fans Descend vertically from th...

Страница 18: ...M based on the charts developed by AMCA AIR MOVING AND CONDITIONING ASSOCIATION To calculate the additional flow resistance a graph is used which presents a family of straight lines on logarithmic velocity flow resistance coordinates Each line which is identified by a different letter of the alphabet represents an abnormal situation that determines an additional flow resistance AMCA lists the adve...

Страница 19: ...FLOW RESISTANCE VALUES according to the Se sp ratio should the locks be installed on the delivery inlet If the air locks are supplied by TCE consult the SAL air lock technical bulletin Abnormal situations in relation to the reference standard may also occur on the intake and are basically connected with the possible formation of eddies caused by curves in the inlet conduit in conflict with the fan...

Страница 20: ...the filtration diaphragm is washed without removing it from the frame if necessary using domestic detergents To avoid damaging the filter the temperature of the water must not exceed 50 C Do not use solvents or caustic soda Let the diaphragm dry by evaporation and refit it only when it is perfectly dry TCF advises you to CHECK THE CONDITION OF THE FILTERS ON A WEEKLY BASIS THE PREFILTERS MUST BE R...

Страница 21: ...he aperture uppermost rinse them with a weak jet of warm water 50 C max letting the impurities run out at the bottom through the filtration diaphragm let the filters dry thoroughly by evaporation before refitting them Do not use air jets to dry them In this way the filters can be cleaned 2 3 times after which the filter s characteristics will be compromised and it will have to be replaced 6 2 5 No...

Страница 22: ...freezing with the arrival of winter For this purpose TCF recommends the following steps In the case of prolonged idleness of the heat exchanger circuits they should be completed drained Where an anti freeze system based on heating elements is provided to protect the exchanger make sure that the control board is constantly powered up On systems operating with anti freeze check its efficiency and to...

Страница 23: ...ows stop the electrical pump cut off the water feed using the relevant gate let the block dry completely keeping the fan in operation remove the frame housing the block by undoing the securing screws and lift it out of the unit through the inspection door extract the fouled block from the housing and replace it with another of the same size Take care with the direction of fluid flow the water whic...

Страница 24: ...ed with grease nipples require periodic lubrication The greasing intervals under normal operating conditions are shown in Table 11 TABLE 10 Greasing of motor bearing NOTE The bearings must be greased more frequently in harsh operating conditions 6 5 3 Drive In order to ensure optimum drive efficiency and to avoid damaging the fan motor unit the drive must be kept in perfect working order The follo...

Страница 25: ... case of drives with several belts the belts must be replaced at the same time This means that there must not be belts presenting different states of wear in the same drive system the number of belts must always match the number of races in this type of drive system the belt slack must be on the same side as shown in Hg 40 before they are tensioned 6 6 Heat recuperator 6 6 1 Crossover flow static ...

Страница 26: ... rate This is the result of an uncontrolled increase in resistance in the air moving circuit which alters the fan s operating point The most frequent causes are excessively clogged filters formation of frost or ice on the front surface of the prefilters in particularly damp and cold climates on Units operating entirely with external air blockage of the intake grille s especially external air intak...

Страница 27: ...s working life 7 SAFETY 7 1 SAFETY RELATED FEATURES OF AIR TREATMENT UNIT TCF Srl has fitted its Air Treatment Units with every possible safety feature to prevent accidents especially during start up and maintenance Some of these SAFETY FEATURES are listed below INSPECTION DOORS THAT CAN ONLY BE OPENED WITH A KEY are installed in the sections housing rotating parts and drives the GRATES and HOUSIN...

Страница 28: ...ano di Granarolo E BO Declares that the following products AIR HANDLING UNIT Mod ZAE Customer Reference Order n Construction year is in compliance with the following Directives 2004 108 CE 2006 42 CE 91 368 CEE 93 68 CEE 2006 95 CE IT IS NECESSARY HOWEVER TO VERIFY THAT THE INSTALLATION AND THE DRIVE ARE CARRY OUT TO YOU CORRECTLY AND IN THE RESPECT OF DIRECTIVES EMC 2004 108 CE AND 2006 42 CE and...

Страница 29: ...hould be sent prepaid to our headquarters and the replacement will be sent carriage forward Please note too that the warranty does not include the services of our personnel for the replacement of the part on site this cost is entirely for the installer s account On receipt of the returned material deemed to be defective an inspection will be carried out to establish whether the part reveals abnorm...

Страница 30: ...30 ...

Отзывы: