TRU-THERM
™
INSTALLATION & OWNERS MANUAL
7
Step 3- Set up Bottom Panel and Tracks
•
Centre and level the Bottom door panel in the opening as shown in figure E
below. The panel will overlap the opening by 50mm each side.
•
Temporarily attach the vertical tracks to the door jambs using the TL190 brackets
which are attached to the pre-drilled holes in the tracks using the M8x16 dome
head bolts and flange nuts, and then fastened to the wall. The bottom wheel
should be hard in against the spacer to locate the bottom end of the track.
Level
FIGURE E