131
/
188
Coolant system distribution map
M310
1- Main water tank 2- Water tank filling port 3- Secondary water tank 4- Aluminum water inlet pipe 5- Aluminum water outlet
pipe 6- Small water tank 7- Water and oil shared sensor 8- Thermostat 9- Water pump cover assembly
1-
Main water tank 2- Water tank filling port 3- Secondary water tank 4- Aluminum water inlet pipe 5- Aluminum water outlet
pipe 6- Small water tank 7- Water and oil shared sensor 8- Thermostat 9- Water pump cover assembly
M125
Содержание ZONTES 310T-M 2022
Страница 1: ...1 188 ZT125 310T M Maintenance Manual 2022 09 14 ...
Страница 91: ...91 188 l So far the adjustment operation of the valve clearance is completed ...
Страница 115: ...115 188 Electrical schematic diagram of EFI system ...
Страница 156: ...156 188 Exploded view of front fork components M125 310 Directional exploded view ...
Страница 157: ...157 188 Front fork exploded view The M125 are similar to the M310 taking the M310 as an example ...
Страница 158: ...158 188 Exploded view of lower link board The M125 are similar to the M310 taking the M310 as an example ...
Страница 173: ...173 188 ...